Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

OAK GROVE

EGTS · Loc 30050
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.085
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.087
Bcf/d
30-day average
0.083
30 of 30 days posted
30-day high
0.089
Nov 13
30-day low
0.059
Nov 4
Operating capacity
0.094
Bcf/d as posted, evening cycle
Utilization
91%
headroom 9%

Scheduled quantities as posted by EGTS on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.085+0.000
Nov 260.085-0.002
Nov 250.087+0.000
Nov 240.087-0.001
Nov 230.088+0.001
Nov 220.088+0.001
Nov 210.087+0.001
Nov 200.086+0.001
Nov 190.085+0.006
Nov 180.078-0.007
Nov 170.086-0.002
Nov 160.087+0.005
Nov 150.082-0.003
Nov 140.085-0.004
Nov 130.089+0.004
Nov 120.085+0.008
Nov 110.076-0.011
Nov 100.087+0.002
Nov 90.085+0.000
Nov 80.085+0.000
Nov 70.085+0.000
Nov 60.085+0.026
Nov 50.059+0.000
Nov 40.059-0.002
Nov 30.061-0.024
Nov 20.085+0.000
Nov 10.085-0.002
Oct 310.087+0.004
Oct 300.083+0.000
Oct 290.083—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Eastern Gas Transmission (EGTS)OAK GROVE

Eastern Gas Transmission (EGTS)Placed at the center of Pleasants, WV — approximate; the exact meter site is not published.

Recent notices on EGTS

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All EGTS notices →

EGTS · posted 2026-11-18 · effective 2026-11-19 · informational
EGTS · posted 2026-11-16 · effective 2026-11-17 · informational
EGTS · posted 2026-11-13 · effective 2026-11-13 · informational
EGTS · posted 2026-11-09 · effective 2026-11-11 · informational
EGTS · posted 2026-11-08 · effective 2026-11-10 · informational
EGTS · posted 2026-11-06 · effective 2026-11-06 · informational
EGTS · posted 2026-11-06 · effective 2026-11-10 · informational
EGTS · posted 2026-11-05 · effective 2026-11-07 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, OAK GROVE (EGTS loc 30050) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/egts/30050/