Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

LONG LEVEL RD (LN20)

EGTS · Loc 21107 · Pennsylvania
Gathering receipt · counted in Supply / Production
Gas day Nov 27
-0.011
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
-0.009
Bcf/d
30-day average
-0.007
30 of 30 days posted
30-day high
-0.000
Nov 18
30-day low
-0.011
Nov 27
Operating capacity
0.011
Bcf/d as posted, evening cycle
Utilization
100%
headroom 0%

Scheduled quantities as posted by EGTS on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.015-0.010-0.0050.000Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27-0.011+0.000
Nov 26-0.011-0.001
Nov 25-0.009-0.007
Nov 24-0.002+0.007
Nov 23-0.009-0.001
Nov 22-0.009+0.002
Nov 21-0.011-0.001
Nov 20-0.009+0.000
Nov 19-0.009-0.009
Nov 18-0.000+0.009
Nov 17-0.009-0.009
Nov 16-0.000+0.000
Nov 15-0.000+0.000
Nov 14-0.000+0.000
Nov 13-0.000+0.000
Nov 12-0.000+0.001
Nov 11-0.001+0.003
Nov 10-0.004+0.003
Nov 9-0.007+0.004
Nov 8-0.011+0.000
Nov 7-0.011+0.000
Nov 6-0.011-0.001
Nov 5-0.010-0.006
Nov 4-0.004+0.003
Nov 3-0.008+0.002
Nov 2-0.009+0.000
Nov 1-0.009-0.001
Oct 31-0.009+0.000
Oct 30-0.009+0.000
Oct 29-0.009—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Eastern Gas Transmission (EGTS)

Eastern Gas Transmission (EGTS)State only (Pennsylvania) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on EGTS

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All EGTS notices →

EGTS · posted 2026-11-18 · effective 2026-11-19 · informational
EGTS · posted 2026-11-16 · effective 2026-11-17 · informational
EGTS · posted 2026-11-13 · effective 2026-11-13 · informational
EGTS · posted 2026-11-09 · effective 2026-11-11 · informational
EGTS · posted 2026-11-08 · effective 2026-11-10 · informational
EGTS · posted 2026-11-06 · effective 2026-11-06 · informational
EGTS · posted 2026-11-06 · effective 2026-11-10 · informational
EGTS · posted 2026-11-05 · effective 2026-11-07 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, LONG LEVEL RD (LN20) (EGTS loc 21107) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/egts/21107/