Gas day Nov 27
0.003
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.003
Bcf/d
30-day average
0.003
30 of 30 days posted
30-day high
0.003
Nov 27
30-day low
0.002
Oct 31
Operating capacity
0.019
Bcf/d as posted, evening cycle
Utilization
16%
headroom 84%
Scheduled quantities as posted by CPL on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.003 | +0.000 |
| Nov 26 | 0.003 | +0.000 |
| Nov 25 | 0.003 | +0.000 |
| Nov 24 | 0.003 | +0.000 |
| Nov 23 | 0.003 | +0.000 |
| Nov 22 | 0.003 | +0.000 |
| Nov 21 | 0.003 | +0.000 |
| Nov 20 | 0.003 | +0.000 |
| Nov 19 | 0.003 | +0.000 |
| Nov 18 | 0.003 | +0.000 |
| Nov 17 | 0.003 | +0.000 |
| Nov 16 | 0.003 | +0.000 |
| Nov 15 | 0.003 | +0.000 |
| Nov 14 | 0.003 | +0.000 |
| Nov 13 | 0.003 | +0.000 |
| Nov 12 | 0.003 | +0.000 |
| Nov 11 | 0.003 | +0.000 |
| Nov 10 | 0.003 | +0.000 |
| Nov 9 | 0.003 | +0.000 |
| Nov 8 | 0.003 | +0.000 |
| Nov 7 | 0.003 | +0.000 |
| Nov 6 | 0.003 | +0.000 |
| Nov 5 | 0.003 | +0.000 |
| Nov 4 | 0.003 | +0.000 |
| Nov 3 | 0.003 | +0.000 |
| Nov 2 | 0.003 | +0.000 |
| Nov 1 | 0.003 | +0.002 |
| Oct 31 | 0.002 | +0.000 |
| Oct 30 | 0.002 | +0.000 |
| Oct 29 | 0.002 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Cove Point PipelinePlaced at the center of Calvert, MD — approximate; the exact meter site is not published.
Notices
Recent notices on CPL
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All CPL notices →
SEV 4/5Cove Point Operational Alert
CPL · posted 2026-11-25 · effective 2026-11-25 · operational alert
CPL has reissued a Critical Operational Alert (PPO subcategory) for Cove Point LNG under new notice ID CPL-1012889, replacing the prior posting CPL-1012597 from 2026-11-10 with no change in operational content. No curtailment volume or restoration timeline is stated. Pre-event fe…
SEV 4/5Cove Point Operational Alert
CPL · posted 2026-11-10 · effective 2026-11-10 · operational alert
Cove Point LNG has issued a Critical Operational Alert (PPO subcategory) effective November 10, 2026. No specific capacity figures or curtailment volumes are stated in the notice text. Prior to the event, the Cove Point Plant delivery point was moving approximately 0.86 Bcf/d (D:…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other LDC Citygate meters on CPL
- WGL-GARDINER ROAD 0.061 Bcf/d
Cite thisEnercast PipeScrape, WGL-PATUXENT (CPL loc 77050) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/cpl/77050/