Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

WGL-GARDINER ROAD

CPL · Loc 77030 · Charles, Maryland
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.062
Bcf/d scheduled
Δ Day-over-day
-0.037
vs Nov 25
7-day average
0.079
Bcf/d
30-day average
0.066
30 of 30 days posted
30-day high
0.135
Nov 24
30-day low
0.046
Nov 21
Operating capacity
0.396
Bcf/d as posted, evening cycle
Utilization
16%
headroom 84%

Scheduled quantities as posted by CPL on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.000.050.100.15Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.062-0.037
Nov 250.099-0.036
Nov 240.135+0.063
Nov 230.072+0.018
Nov 220.054+0.008
Nov 210.046-0.037
Nov 200.083-0.018
Nov 190.101-0.004
Nov 180.105-0.002
Nov 170.107-0.006
Nov 160.113+0.021
Nov 150.092+0.022
Nov 140.070-0.007
Nov 130.077+0.031
Nov 120.046-0.001
Nov 110.047+0.001
Nov 100.046+0.000
Nov 90.046+0.000
Nov 80.046+0.000
Nov 70.046+0.000
Nov 60.046+0.000
Nov 50.046+0.000
Nov 40.046+0.000
Nov 30.046+0.000
Nov 20.046+0.000
Nov 10.046-0.002
Oct 310.048+0.000
Oct 300.048+0.000
Oct 290.048-0.010
Oct 280.058—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Cove Point PipelineWGL-GARDINER ROAD

Cove Point PipelinePlaced at the center of Charles, MD — approximate; the exact meter site is not published.

Recent notices on CPL

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All CPL notices →

CPL · posted 2026-11-25 · effective 2026-11-25 · operational alert
CPL has reissued a Critical Operational Alert (PPO subcategory) for Cove Point LNG under new notice ID CPL-1012889, replacing the prior posting CPL-1012597 from 2026-11-10 with no change in operational content. No curtailment volume or restoration timeline is stated. Pre-event fe…
CPL · posted 2026-11-10 · effective 2026-11-10 · operational alert
Cove Point LNG has issued a Critical Operational Alert (PPO subcategory) effective November 10, 2026. No specific capacity figures or curtailment volumes are stated in the notice text. Prior to the event, the Cove Point Plant delivery point was moving approximately 0.86 Bcf/d (D:…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, WGL-GARDINER ROAD (CPL loc 77030) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/cpl/77030/