Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

SUMMIDNI/CIG (HFR) HEREFORD RANCH W

Colorado Interstate Gas (CIG) · Loc 800298 · Colorado
Processing plant · counted in Supply / Production
Gas day Nov 27
0.011
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.008
Bcf/d
30-day average
0.010
30 of 30 days posted
30-day high
0.018
Nov 6
30-day low
0.004
Oct 30
Operating capacity
0.051
Bcf/d as posted, evening cycle
Utilization
23%
headroom 77%

Scheduled quantities as posted by Colorado Interstate Gas (CIG) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0050.0100.0150.020Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.011+0.000
Nov 260.011+0.001
Nov 250.011+0.006
Nov 240.005+0.000
Nov 230.005+0.000
Nov 220.005-0.002
Nov 210.007-0.002
Nov 200.009+0.000
Nov 190.009+0.002
Nov 180.007-0.004
Nov 170.011+0.002
Nov 160.009+0.000
Nov 150.009+0.000
Nov 140.009+0.001
Nov 130.008+0.000
Nov 120.008+0.000
Nov 110.008+0.001
Nov 100.007-0.002
Nov 90.009+0.000
Nov 80.009+0.000
Nov 70.009-0.009
Nov 60.018+0.007
Nov 50.011-0.001
Nov 40.012+0.001
Nov 30.011-0.002
Nov 20.013+0.000
Nov 10.013+0.003
Oct 310.009+0.005
Oct 300.004-0.011
Oct 290.015—
47 more days on file for this meter, back to September 12, 2026. Full meter-level history is part of Institutional (API and downloads).

State only (Colorado) — the meter's exact site is not geocoded; the ring marks the state, not the point.

No recent notices matched or named this point, and no severity 3+ notices on Colorado Interstate Gas (CIG) in the last 30 days.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, SUMMIDNI/CIG (HFR) HEREFORD RANCH W (Colorado Interstate Gas (CIG) loc 800298) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/colorado-interstate-gas-cig/800298/