Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

DCP OPER/CIG (LAS) LASALLE METER ST

Colorado Interstate Gas (CIG) · Loc 800364 · Colorado
Processing plant · counted in Supply / Production
Gas day Nov 27
0.295
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.270
Bcf/d
30-day average
0.253
30 of 30 days posted
30-day high
0.305
Nov 8
30-day low
0.152
Oct 30
Operating capacity
0.546
Bcf/d as posted, evening cycle
Utilization
54%
headroom 46%

Scheduled quantities as posted by Colorado Interstate Gas (CIG) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.300.40Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.295+0.000
Nov 260.295+0.014
Nov 250.282+0.001
Nov 240.280+0.035
Nov 230.245+0.000
Nov 220.245+0.000
Nov 210.245+0.005
Nov 200.240+0.020
Nov 190.220-0.075
Nov 180.295+0.075
Nov 170.220-0.040
Nov 160.260+0.000
Nov 150.260+0.000
Nov 140.260+0.040
Nov 130.220-0.025
Nov 120.245+0.000
Nov 110.245+0.025
Nov 100.220-0.085
Nov 90.305-0.000
Nov 80.305+0.000
Nov 70.305+0.045
Nov 60.260-0.020
Nov 50.280+0.010
Nov 40.270-0.025
Nov 30.295+0.050
Nov 20.245+0.001
Nov 10.244+0.092
Oct 310.152+0.001
Oct 300.152-0.053
Oct 290.205—
47 more days on file for this meter, back to September 12, 2026. Full meter-level history is part of Institutional (API and downloads).

State only (Colorado) — the meter's exact site is not geocoded; the ring marks the state, not the point.

No recent notices matched or named this point, and no severity 3+ notices on Colorado Interstate Gas (CIG) in the last 30 days.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, DCP OPER/CIG (LAS) LASALLE METER ST (Colorado Interstate Gas (CIG) loc 800364) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/colorado-interstate-gas-cig/800364/