Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

EVERG NR/CIG (BRC) BURRO CANYON LAS

Colorado Interstate Gas (CIG) · Loc 800107 · Colorado
Gathering receipt · counted in Supply / Production
Gas day Nov 27
0.010
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.010
Bcf/d
30-day average
0.010
30 of 30 days posted
30-day high
0.011
Nov 17
30-day low
0.007
Oct 29
Operating capacity
0.194
Bcf/d as posted, evening cycle
Utilization
5%
headroom 95%

Scheduled quantities as posted by Colorado Interstate Gas (CIG) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0050.0100.015Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.010+0.000
Nov 260.010-0.000
Nov 250.010+0.000
Nov 240.010+0.000
Nov 230.010+0.000
Nov 220.010+0.000
Nov 210.010+0.000
Nov 200.010+0.000
Nov 190.010+0.000
Nov 180.010-0.001
Nov 170.011+0.000
Nov 160.011+0.000
Nov 150.011+0.000
Nov 140.011+0.001
Nov 130.010+0.000
Nov 120.010+0.000
Nov 110.010+0.002
Nov 100.008-0.000
Nov 90.009+0.000
Nov 80.009+0.000
Nov 70.009+0.000
Nov 60.009+0.000
Nov 50.009+0.000
Nov 40.009-0.000
Nov 30.009+0.000
Nov 20.009+0.000
Nov 10.009-0.001
Oct 310.009+0.000
Oct 300.009+0.002
Oct 290.007—
47 more days on file for this meter, back to September 12, 2026. Full meter-level history is part of Institutional (API and downloads).

State only (Colorado) — the meter's exact site is not geocoded; the ring marks the state, not the point.

No recent notices matched or named this point, and no severity 3+ notices on Colorado Interstate Gas (CIG) in the last 30 days.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, EVERG NR/CIG (BRC) BURRO CANYON LAS (Colorado Interstate Gas (CIG) loc 800107) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/colorado-interstate-gas-cig/800107/