Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

Kerr-McGee/Connector Latham Weld

Cheyenne Connector · Loc 60351 · Colorado
Processing plant · counted in Supply / Production
Gas day Nov 26
0.370
Bcf/d scheduled
Δ Day-over-day
-0.002
vs Nov 25
7-day average
0.367
Bcf/d
30-day average
0.372
30 of 30 days posted
30-day high
0.414
Nov 4
30-day low
0.325
Nov 11
Operating capacity
0.414
Bcf/d as posted, evening cycle
Utilization
89%
headroom 11%

Scheduled quantities as posted by Cheyenne Connector on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.200.400.60Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.370-0.002
Nov 250.372+0.005
Nov 240.367-0.005
Nov 230.372+0.000
Nov 220.372+0.000
Nov 210.372+0.031
Nov 200.341-0.030
Nov 190.371+0.010
Nov 180.361-0.010
Nov 170.371-0.009
Nov 160.380+0.000
Nov 150.380+0.000
Nov 140.380+0.048
Nov 130.332-0.043
Nov 120.375+0.050
Nov 110.325-0.035
Nov 100.360-0.022
Nov 90.382+0.000
Nov 80.382+0.000
Nov 70.382+0.002
Nov 60.380+0.010
Nov 50.370-0.044
Nov 40.414+0.030
Nov 30.384-0.004
Nov 20.388+0.020
Nov 10.368-0.011
Oct 310.379+0.000
Oct 300.379-0.005
Oct 290.384+0.015
Oct 280.368—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).

State only (Colorado) — the meter's exact site is not geocoded; the ring marks the state, not the point.

No recent notices matched or named this point, and no severity 3+ notices on Cheyenne Connector in the last 30 days.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Kerr-McGee/Connector Latham Weld (Cheyenne Connector loc 60351) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/cheyenne-connector/60351/