Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

Kerr-McGee/Connector Lancaster Weld

Cheyenne Connector · Loc 60350 · Colorado
Processing plant · counted in Supply / Production
Gas day Nov 27
0.165
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.179
Bcf/d
30-day average
0.215
30 of 30 days posted
30-day high
0.299
Nov 11
30-day low
0.157
Nov 25
Operating capacity
0.310
Bcf/d as posted, evening cycle
Utilization
53%
headroom 47%

Scheduled quantities as posted by Cheyenne Connector on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.30Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.165+0.000
Nov 260.165+0.007
Nov 250.157-0.007
Nov 240.165-0.036
Nov 230.201+0.000
Nov 220.201+0.000
Nov 210.201-0.008
Nov 200.209+0.047
Nov 190.162-0.045
Nov 180.207-0.017
Nov 170.224+0.031
Nov 160.193+0.000
Nov 150.193+0.000
Nov 140.193-0.067
Nov 130.259+0.010
Nov 120.250-0.050
Nov 110.299+0.045
Nov 100.255+0.017
Nov 90.237+0.001
Nov 80.237-0.000
Nov 70.237+0.037
Nov 60.200-0.034
Nov 50.234+0.028
Nov 40.206-0.020
Nov 30.226+0.001
Nov 20.225-0.020
Nov 10.245+0.012
Oct 310.233+0.002
Oct 300.231-0.000
Oct 290.231—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).

State only (Colorado) — the meter's exact site is not geocoded; the ring marks the state, not the point.

No recent notices matched or named this point, and no severity 3+ notices on Cheyenne Connector in the last 30 days.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Kerr-McGee/Connector Lancaster Weld (Cheyenne Connector loc 60350) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/cheyenne-connector/60350/