Gas day Nov 26
0.122
Bcf/d scheduled
Δ Day-over-day
+0.010
vs Nov 25
7-day average
0.119
Bcf/d
30-day average
0.126
24 of 30 days posted
30-day high
0.151
Oct 31
30-day low
0.106
Nov 19
Operating capacity
0.164
Bcf/d as posted, timely cycle
Utilization
75%
headroom 25%
Scheduled quantities as posted by Columbia Gulf Transmission (CGT) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.122 | +0.010 |
| Nov 25 | 0.112 | -0.005 |
| Nov 24 | 0.117 | -0.003 |
| Nov 23 | 0.120 | +0.000 |
| Nov 22 | 0.120 | +0.000 |
| Nov 21 | 0.120 | -0.001 |
| Nov 20 | 0.121 | +0.014 |
| Nov 19 | 0.106 | -0.010 |
| Nov 18 | 0.116 | -0.005 |
| Nov 17 | 0.121 | -0.005 |
| Nov 16 | 0.126 | +0.000 |
| Nov 15 | 0.126 | +0.000 |
| Nov 14 | 0.126 | +0.007 |
| Nov 13 | 0.119 | -0.003 |
| Nov 12 | 0.123 | +0.000 |
| Nov 11 | 0.123 | -0.001 |
| Nov 10 | 0.123 | -0.005 |
| Nov 9 | 0.128 | +0.000 |
| Nov 8 | 0.128 | +0.000 |
| Nov 7 | 0.128 | — |
| Nov 6 | — | — |
| Nov 5 | — | — |
| Nov 4 | — | — |
| Nov 3 | — | — |
| Nov 2 | — | — |
| Nov 1 | — | — |
| Oct 31 | 0.151 | +0.000 |
| Oct 30 | 0.151 | +0.000 |
| Oct 29 | 0.151 | +0.000 |
| Oct 28 | 0.151 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Columbia Gulf Transmission (CGT)Placed at the matched facility (Venice Gas Plant); approximate.
Notices
Recent notices on Columbia Gulf Transmission (CGT)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gulf Transmission (CGT) notices →
Columbia Gulf Transmission (CGT) · posted 2026-11-25 · effective 2026-12-01 · informational
Columbia Gulf Transmission (CGT) · posted 2026-11-11 · effective 2026-11-17 · informational
Columbia Gulf Transmission (CGT) · posted 2026-10-27 · effective 2026-11-03 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on Columbia Gulf Transmission (CGT)
- BROADMORE RD. 0.680 Bcf/d
- REGENCY II 0.063 Bcf/d
- TRANS LA/ATMOS -0.023 Bcf/d
- CARTER CREEK 0.015 Bcf/d
- DELTA -0.014 Bcf/d
- ATMOS - LEFLORE, MS -0.007 Bcf/d
- Merit Station -0.000 Bcf/d
Cite thisEnercast PipeScrape, DMS-VENICE PLANT (Columbia Gulf Transmission (CGT) loc 595) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/cgt/595/