Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

ATMOS - LEFLORE, MS

Columbia Gulf Transmission (CGT) · Loc 4234 · Mississippi
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
-0.007
Bcf/d scheduled
Δ Day-over-day
+0.001
vs Nov 25
7-day average
-0.006
Bcf/d
30-day average
-0.004
30 of 30 days posted
30-day high
-0.002
Nov 5
30-day low
-0.009
Nov 24
Operating capacity
0.050
Bcf/d as posted, timely cycle
Utilization
14%
headroom 86%

Scheduled quantities as posted by Columbia Gulf Transmission (CGT) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.010-0.007-0.005-0.0020.000Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 26-0.007+0.001
Nov 25-0.008+0.001
Nov 24-0.009-0.005
Nov 23-0.004+0.000
Nov 22-0.004+0.000
Nov 21-0.004+0.000
Nov 20-0.004+0.000
Nov 19-0.004+0.000
Nov 18-0.004+0.000
Nov 17-0.004+0.000
Nov 16-0.004+0.000
Nov 15-0.004+0.002
Nov 14-0.006-0.002
Nov 13-0.004+0.000
Nov 12-0.004+0.000
Nov 11-0.004+0.000
Nov 10-0.004+0.000
Nov 9-0.004+0.000
Nov 8-0.004+0.000
Nov 7-0.004+0.000
Nov 6-0.004-0.002
Nov 5-0.002+0.000
Nov 4-0.002+0.002
Nov 3-0.004+0.000
Nov 2-0.004+0.000
Nov 1-0.004-0.001
Oct 31-0.003+0.000
Oct 30-0.003+0.000
Oct 29-0.003+0.002
Oct 28-0.004—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gulf Transmission (CGT)

Columbia Gulf Transmission (CGT)State only (Mississippi) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Columbia Gulf Transmission (CGT)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gulf Transmission (CGT) notices →

Columbia Gulf Transmission (CGT) · posted 2026-11-25 · effective 2026-12-01 · informational
Columbia Gulf Transmission (CGT) · posted 2026-11-11 · effective 2026-11-17 · informational
Columbia Gulf Transmission (CGT) · posted 2026-10-27 · effective 2026-11-03 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ATMOS - LEFLORE, MS (Columbia Gulf Transmission (CGT) loc 4234) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/cgt/4234/