Gas day Nov 27
0.001
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.001
Bcf/d
30-day average
0.001
30 of 30 days posted
30-day high
0.001
Nov 27
30-day low
0.001
Oct 31
Operating capacity
0.004
Bcf/d as posted, timely cycle
Utilization
36%
headroom 64%
Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.001 | +0.000 |
| Nov 26 | 0.001 | +0.000 |
| Nov 25 | 0.001 | +0.000 |
| Nov 24 | 0.001 | +0.000 |
| Nov 23 | 0.001 | +0.000 |
| Nov 22 | 0.001 | +0.000 |
| Nov 21 | 0.001 | +0.000 |
| Nov 20 | 0.001 | +0.000 |
| Nov 19 | 0.001 | +0.000 |
| Nov 18 | 0.001 | +0.000 |
| Nov 17 | 0.001 | +0.000 |
| Nov 16 | 0.001 | +0.000 |
| Nov 15 | 0.001 | +0.000 |
| Nov 14 | 0.001 | +0.000 |
| Nov 13 | 0.001 | +0.000 |
| Nov 12 | 0.001 | +0.000 |
| Nov 11 | 0.001 | +0.000 |
| Nov 10 | 0.001 | +0.000 |
| Nov 9 | 0.001 | +0.000 |
| Nov 8 | 0.001 | +0.000 |
| Nov 7 | 0.001 | +0.000 |
| Nov 6 | 0.001 | +0.000 |
| Nov 5 | 0.001 | +0.000 |
| Nov 4 | 0.001 | +0.000 |
| Nov 3 | 0.001 | +0.000 |
| Nov 2 | 0.001 | +0.000 |
| Nov 1 | 0.001 | +0.000 |
| Oct 31 | 0.001 | +0.000 |
| Oct 30 | 0.001 | -0.000 |
| Oct 29 | 0.001 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
ANR PipelinePlaced at the center of Texas, OK — approximate; the exact meter site is not published.
Notices
Recent notices on ANR Pipeline (TC Energy)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →
ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other End Use (Industrial) meters on ANR Pipeline (TC Energy)
- BURKES RUN 0.086 Bcf/d
- MITCHELL CEMENT 0.022 Bcf/d
- OSHKOSH RIPPLE ROAD 0.009 Bcf/d
- FRITO LAY SALES 0.002 Bcf/d
Cite thisEnercast PipeScrape, HITCH INT (ANR Pipeline (TC Energy) loc 237023) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/anr/237023/