Gas day Nov 26
0.086
Bcf/d scheduled
Δ Day-over-day
+0.001
vs Nov 25
7-day average
0.087
Bcf/d
30-day average
0.087
30 of 30 days posted
30-day high
0.093
Nov 4
30-day low
0.069
Nov 2
Operating capacity
0.124
Bcf/d as posted, timely cycle
Utilization
69%
headroom 31%
Scheduled quantities as posted by ANR Pipeline (TC Energy) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.086 | +0.001 |
| Nov 25 | 0.085 | -0.001 |
| Nov 24 | 0.086 | +0.000 |
| Nov 23 | 0.086 | -0.000 |
| Nov 22 | 0.087 | -0.001 |
| Nov 21 | 0.088 | -0.004 |
| Nov 20 | 0.092 | +0.004 |
| Nov 19 | 0.089 | +0.001 |
| Nov 18 | 0.088 | -0.002 |
| Nov 17 | 0.090 | +0.002 |
| Nov 16 | 0.088 | -0.000 |
| Nov 15 | 0.088 | -0.000 |
| Nov 14 | 0.088 | +0.001 |
| Nov 13 | 0.088 | +0.000 |
| Nov 12 | 0.088 | -0.000 |
| Nov 11 | 0.088 | +0.006 |
| Nov 10 | 0.082 | -0.005 |
| Nov 9 | 0.087 | -0.001 |
| Nov 8 | 0.087 | -0.000 |
| Nov 7 | 0.088 | -0.001 |
| Nov 6 | 0.088 | -0.000 |
| Nov 5 | 0.089 | -0.004 |
| Nov 4 | 0.093 | +0.005 |
| Nov 3 | 0.088 | +0.019 |
| Nov 2 | 0.069 | -0.019 |
| Nov 1 | 0.088 | +0.001 |
| Oct 31 | 0.088 | +0.001 |
| Oct 30 | 0.087 | +0.001 |
| Oct 29 | 0.086 | -0.000 |
| Oct 28 | 0.087 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
ANR PipelinePlaced at the center of Lee, IA — approximate; the exact meter site is not published.
Notices
Recent notices on ANR Pipeline (TC Energy)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All ANR Pipeline (TC Energy) notices →
ANR Pipeline (TC Energy) · posted 2026-11-19 · informational
ANR Pipeline (TC Energy) · posted 2026-11-05 · informational
ANR Pipeline (TC Energy) · posted 2026-10-27 · force majeure
ANR Pipeline has declared a force majeure on the Southwest Mainline Northbound following a third-party line strike between MLV 39-40 in Jefferson County, Iowa on October 27. Capacity is restricted to 560 MMcf/d northbound (LOC FPSWMLNB), with 146 MMcf/d removed Oct 28-31 and 171 …
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other End Use (Industrial) meters on ANR Pipeline (TC Energy)
- MITCHELL CEMENT 0.022 Bcf/d
- OSHKOSH RIPPLE ROAD 0.007 Bcf/d
- FRITO LAY SALES 0.001 Bcf/d
- HITCH INT 0.001 Bcf/d
Cite thisEnercast PipeScrape, BURKES RUN (ANR Pipeline (TC Energy) loc 1394871) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/anr/1394871/