Operational Alert
≈1.430 Bcf/d est.
Until Further Notice
1 Days
Gulf South Pipeline has implemented a System Management Plan at Location SLN 024329 Stratton Ridge (to Freeport LNG) effective 08:30 AM on October 26, 2026, reducing scheduled quantities to 0 Dth/d until further notice through at least October 27 at 09:00 AM. The curtailment was triggered by the customer's (Freeport LNG's) failure to take confirmed quantities, forcing Gulf South to balance nominations to zero. Pre-event flow at this location had been running at a median of 1.43 Bcf/d (range 1.02-1.46 Bcf/d over the prior 7 days), meaning approximately 1.43 Bcf/d of LNG feed gas has been zeroed out.
Gulf South SMP cuts Freeport LNG feed gas at Stratton Ridge (loc 24329) to 0 Dth/d from a pre-event median of 1.43 Bcf/d (range 1.02-1.46), stranding ~1.43 Bcf/d onshore and applying bearish pressure on Henry Hub and Gulf Coast basis until Freeport resumes taking nominations.
Reroute: None: this is a demand-side curtailment -- Freeport LNG is not taking gas, so the volume backs up onshore regardless of pipeline alternatives; no reroute to another LNG terminal is implied by this notice.
View original notice text Loading…
Gulf South Pipeline
Update: Heidelberg Compressor Station Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Carthage #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 10/23/2026 - 10/29/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Operational Alert
Until Further Notice
1 Days
Gulf South Pipeline has issued a second consecutive Over-Under Performance notice (new ID 5038899) for Loc 24329 Stratton Ridge to Freeport LNG, covering Gas Day 10/21/2026 and until further notice -- an exact reissuance of yesterday's notice (GSPL-5038892) shifted forward one gas day. The customer continues to fail to take confirmed quantities at the Stratton Ridge delivery point, and Gulf South will reduce scheduling for remaining nomination cycles based on Projected Daily Quantities. Pre-event scheduled flow at Loc 24329 was 1.43 Bcf/d median (range 1.02-1.46 Bcf/d over the prior seven days), against 1.78 Bcf/d operating capacity; no explicit new cap or volume cut is stated in this notice.
Freeport LNG feed gas curtailment at Stratton Ridge (Loc 24329) now extends a second consecutive gas day (10/21/2026 UFN); pre-event scheduled flow was ~1.43 Bcf/d median (1.02-1.46 range) vs 1.78 Bcf/d operating capacity, with displaced volumes remaining in the domestic Gulf Coast pool -- bearish Henry Hub regional proxy as long as the under-take persists.
Reroute: None: Stratton Ridge is the dedicated Gulf South delivery point feeding Freeport LNG; displaced feed gas volumes have no alternate export outlet and remain in the domestic market.
View original notice text Loading…
Gulf South Pipeline
Airport Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 301-8-L-A Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Airport Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Operational Alert
Until Further Notice
1 Days
Gulf South Pipeline issued a Critical Over-Under Performance notice on Gas Day 10/20/2026 for Loc 24329 (Stratton Ridge to Freeport LNG), citing a customer's failure to take confirmed quantities and triggering scheduling reductions for remaining nomination cycles through at least Gas Day 10/21/2026. This is a recurrence of the same event posted on 10/17/2026 (GSPL-5038889). The live evening-cycle reading at Loc 24329 shows 1.45 Bcf/d scheduled against 1.78 Bcf/d operating capacity (81.5% utilized, 18.5% headroom), compared to a pre-event 7-day median of 1.43 Bcf/d (range 1.11-1.46 Bcf/d); no explicit volume cut is stated, but scheduling reductions are anticipated and the UFN language keeps the event open-ended.
Gulf South curtailment at Stratton Ridge (Loc 24329) again reduces Freeport LNG feed gas on Gas Day 10/20/2026 -- pre-event baseline was 1.43 Bcf/d median (range 1.11-1.46), live evening cycle shows 1.45 Bcf/d scheduled vs 1.78 Bcf/d operating capacity with no explicit cut volume stated; displaced gas stays in the domestic Gulf Coast pool, bearish Gulf Coast/Henry Hub basis; this is a repeat occurrence from 10/17 and remains UFN.
Reroute: None: Freeport LNG feed gas delivered via this specific lateral cannot be rerouted to the terminal through an alternative path; any curtailed volume remains in the domestic pipeline system.
View original notice text Loading…
Operational Alert
Until Further Notice
1 Days
Gulf South Pipeline issued a Critical Over-Under Performance notice for Gas Day 10/17/2026, citing the customer's failure to take confirmed quantities at Loc 24329 Stratton Ridge to Freeport LNG. Gulf South is implementing scheduling reductions for remaining nomination cycles on 10/17 and until further notice. Live capacity data shows Stratton Ridge (Loc 24329) running at 1.46 Bcf/d scheduled against 1.78 Bcf/d operating capacity (82.2% utilization, 0.317 Bcf/d headroom) as of the evening cycle; the pre-event baseline median was 1.43 Bcf/d over the prior seven gas days, so the posted evening reading is consistent with a partial reduction already in progress with no stated volume for the cut.
Gulf South curtailment at Stratton Ridge (Loc 24329) reduces Freeport LNG feed gas on Gas Day 10/17/2026 -- pre-event baseline was 1.43 Bcf/d (flat over the prior week), live evening cycle shows 1.46 Bcf/d scheduled against 1.78 Bcf/d operating capacity with no explicit cut volume stated; gas displaced from LNG export remains in the domestic Gulf Coast market, bearish for Henry Hub-area pricing.
Reroute: None: this notice directly curtails feed gas deliveries to Freeport LNG at the terminal delivery meter; there is no alternative pipeline pathway that replaces LNG offtake once the customer fails to take at the terminal.
View original notice text Loading…
Gulf South Pipeline
Update: Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 10/16/2026 - 10/22/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Loc 23373 & Loc 23370 Reduced Operational Capacity
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Harrisville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 266-L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Bistineau Compressor & Storage Field Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Mira Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 198 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Westlake Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Hall Summit Legacy Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Rodrigue Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Longview #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 198 Pipeline Maintenance
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Mira Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 59 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Montz Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 198 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Carthage #2 Compressor Station Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 816-1 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 10/09/2026 - 10/15/2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 10/02/2026 - 10/08/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Transfer of Greenville Lateral to Gulf South Pipeline Company, LLC
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Forrest Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 201-9 Meter Maintenance
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 129 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 302 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 301-8-L-A Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 301-8-L-A Pipeline Maintenance
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 266-L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Forrest Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 302 Pipeline Maintenance - Copiah County
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 302 Pipeline Maintenance - Lincoln #1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 302 Pipeline Maintenance - Lincoln #2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 302 Pipeline Maintenance - Flowood
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Hall Summit Expansion Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Delhi Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Vixen Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 330 Pipeline Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned: Airport Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 266-L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Scheduled Quantities Posting Delayed for Gas Day 10/02/2026 TMY
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 196-1-1 Meter Maintenance
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Carthage #2 Compressor Station Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Delhi Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Sterlington Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Tallulah Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Mira Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 09/25/2026 - 10/01/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Hall Summit Expansion Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 129 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Rodrigue Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Longview #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Airport Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Transfer of Greenville Lateral to Gulf South Pipeline Company, LLC
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Gulf South Inability to Take Confirmed Quantities on Index 296
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
GasQuest Issues
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
GasQuest Issues
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 302 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned: Airport Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Unplanned Index 296 Pipeline Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 301-4-1 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Carthage #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 302 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned: Airport Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Mira Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 09/18/2026 - 09/24/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Tallulah Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Hall Summit Expansion Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 391 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Sterlington Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Clarence Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Olla Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Unplanned Bistineau Compressor & Storage Field Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Unplanned Index 296 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Marksville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 23368 Coastal Bend (Tennessee Gas)
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 301-8-L-A Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Rodrigue Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Moss Point Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 311-2-1 Meter Maintenance
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 301-21 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 59 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Carthage Junction Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Deliver Confirmed Quantities at Location 24329
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Hall Summit Legacy Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Operational Alert
Until Further Notice
1 Days
Gulf South Pipeline issued a Critical Over-Under Performance notice on 2026-09-17 for Loc 24329 Stratton Ridge to Freeport LNG, citing the customer's failure to take confirmed delivery quantities. Gulf South is reducing scheduling for remaining nomination cycles for Gas Day 9/17/2026 and until further notice. The LNG feedgas severity floor applies -- this is a direct curtailment of feed gas deliveries to Freeport LNG.
Gulf South curtailment at Stratton Ridge (Loc 24329) reduces Freeport LNG feed gas; live capacity data shows 1.47 Bcf/d scheduled against 1.78 Bcf/d operating capacity at 82.6% utilization as of the evening cycle on 2026-09-17, with no stated volume of the reduction -- gas displaced from LNG export stays in the domestic market, bearish near-term for Henry Hub (regional proxy at 3.010 on 2026-09-16) and Gulf Coast basis.
Reroute: None: Freeport LNG feed gas delivered via the Stratton Ridge lateral has no alternative pipeline path -- curtailed volumes cannot be rerouted to the terminal; instead, displaced supply increases domestic onshore availability.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 09/11/2026 - 09/17/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Gulf South Pipeline Segmentation
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 818 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Tallulah Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Harrisville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Hall Summit Legacy Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 321-4-1 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Operational Alert
Until Further Notice
1 Days
Gulf South Pipeline issued a Critical Over-Under Performance notice on 9/11/2026 for Loc 24329 (Stratton Ridge to Freeport LNG), citing the customer's failure to take confirmed quantities. Gulf South is reducing scheduling for remaining nomination cycles on Gas Day 9/11/2026 and until further notice. The affected location is the dedicated lateral delivering feed gas to Freeport LNG, making this an LNG feedgas disruption event; no specific curtailed volume is stated in the notice.
Freeport LNG feed gas under-performance at Stratton Ridge (Loc 24329) reduces LNG export pull from the Gulf Coast domestic gas market, bearish for Henry Hub regional pricing; live capacity data shows the point running at 1.46 Bcf/d scheduled against 1.78 Bcf/d operating capacity (82% utilized, 0.318 Bcf/d headroom) in the td3 cycle -- the magnitude of the actual curtailment below scheduled is unquantified in the notice text but the 'until further notice' language keeps the downside risk open beyond Gas Day 9/11.
Reroute: None: Freeport LNG is a single-customer export facility served by this dedicated lateral -- there is no alternative route for the feed gas to reach the terminal, and the curtailment keeps gas onshore rather than rerouting it.
View original notice text Loading…
Gulf South Pipeline
Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Termination of Gulf South Critical Period for Areas 1, 2, 3, and 4
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Deliver Confirmed Quantities at Location 23368 Coastal Bend TGP
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Deliver Confirmed Quantities at Location 23367 Kiln TGP
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned Index 296 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Gulf South Inability to Take Confirmed Quantities on Index 296
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 09/04/2026 - 09/10/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Gulf South Inability to Take Confirmed Quantities on Index 296
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Meter Maintenance - Third Party Pipeline Notice (00052)
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned Index 266-L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Carthage #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Deliver Confirmed Quantities at Location 464
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Deliver Confirmed Quantities at Location 464
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Delhi Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 321-4-1 Meter Maintenance
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 301-21 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 311-2-1 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 301-4-1 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 196-1-1 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Longview #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 301-8-L-A Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 266-M Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Deliver Confirmed Quantities at Location 464
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 08/28/2026 - 09/03/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Gulf South Inability to Take Confirmed Quantities on Index 296
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Deliver Confirmed Quantities at Location 464
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 198 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned Index 296 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 321-5 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned: Airport Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Rodrigue Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Mira Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 301-8-L-A Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Deliver Confirmed Quantities at Location 23368
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Location 23367
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Longview #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Deliver Confirmed Quantities at Location 23368
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Vixen Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 08/21/2026 - 08/27/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Meter Maintenance - Third Party Pipeline Notice
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Black Creek Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Carthage Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Safe Harbor Waiver - Loc 24329 Stratton Ridge
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Hall Summit Expansion Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Mira Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 302 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 131 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 301-8-L-A Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 201 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
TMY Scheduled Quantities Posting Delay for 8/24/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 205 -8 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 300 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Arnaudville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 363 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Clarence Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Various Locations
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 198 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
ID1 Cycle Scheduling Delay - Gas Day 8/19/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 08/14/2026 - 08/20/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Operational Alert
Until Further Notice
Gulf South Pipeline has declared a Critical Period across all four of its operating areas (1, 2, 3, and 4) effective 2026-08-19 10:40 AM CT, citing constrained operating conditions and limited operational flexibility to manage shipper imbalances. Shippers are required to balance receipts and deliveries at a Uniform Hourly Rate of Flow, with OFO issuance explicitly threatened if compliance is not achieved. No end time has been posted, and no specific capacity volume has been quantified, but a system-wide Critical Period declaration covering all areas is the broadest possible precursor to a formal OFO on Gulf South.
System-wide Gulf South Critical Period covering all four areas -- the broadest possible pre-OFO alert on this Louisiana/Gulf Coast collector -- signals meaningful supply tightness along the Haynesville and Gulf Coast onshore corridor; the Perryville Transportation Point was already running OVER capacity (scheduled 1.76 Bcf/d vs. 1.10 Bcf/d operating capacity, 159.7% utilization) as of the 2026-08-18 gas day (one day prior to this notice), corroborating the declared system stress; watch for Henry Hub (regional proxy, most recently 2.825 on 2026-08-18) and Transco Zone 4 basis to firm if a formal OFO follows.
Reroute: Moderate: Southern Natural Gas (SNG, unmonitored), Transco (monitored), and Tennessee Gas Pipeline (monitored) serve overlapping Gulf Coast and Southeast markets, providing partial alternative routing for shippers able to redirect volumes; however, a system-wide Gulf South Critical Period affecting all four areas limits the volume that can realistically shift and SNG real-time conditions are unverified.
View original notice text Loading…
Capacity Constraint
Until Further Notice
1 Days
Gulf South Pipeline posted a Critical Over-Under Performance notice on 8/19/2026 citing the customer's failure to take confirmed quantities at Location SLN 24329 (Stratton Ridge to Freeport LNG) in Area 25. Gulf South is reducing confirmations for all remaining nomination cycles for Gas Day 8/19/2026 and until further notice. The prior gas day (8/18) capacity table shows this delivery point with an operating capacity of 1.78 Bcf/d and a scheduled quantity of 0.780 Bcf/d at 43.8% utilization, though those figures predate the event by one gas day and do not reflect the current curtailment.
Freeport LNG feed gas curtailment via Gulf South Stratton Ridge (loc 24329) reduces LNG export offtake and returns gas to the domestic market, applying bearish pressure on Henry Hub and Gulf Coast regional basis; the prior-day table shows up to 0.780 Bcf/d was scheduled at this point, suggesting material volumes are at risk, but the actual curtailed volume is unquantified in this notice.
Reroute: Limited: Freeport LNG feed gas arrives via dedicated laterals and the customer's own receipt infrastructure; Gulf South cannot redirect volumes away from the terminal if the LNG facility is not taking gas, so the domestic supply overhang stands until Freeport LNG resumes normal offtake.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Location 21805
SEV 2/5
Informational
1 Days
Gulf South Pipeline issued a Revision 2 Over-Under Performance notice for Gas Day 8/19/2026, citing a customer's failure to take confirmed quantities at Location 21805 (Discovery Gas Transmission), an offshore Gulf of Mexico gathering interconnect. Scheduling reductions are anticipated for remaining nomination cycles on 8/19 and until further notice based on projected daily quantities. No escalation triggers are present in this revision versus the original posting -- no new locations added, no force majeure, no firm curtailment language, and no capacity volume stated.
No new operational information -- situation unchanged from prior revision, market has already priced this constraint.
Reroute: Limited: Discovery Gas Transmission is an offshore Gulf of Mexico gathering interconnect; underperformance at this point reflects upstream production curtailment with no viable reroute for volumes that fail to flow.
View original notice text Loading…
Gulf South Pipeline
Longview #2 Compressor Station Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
EVE Cycle Scheduling Delay - Gas Day 8/18/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 301-4 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Meter Maintenance - Third Party Pipeline Notice
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Mira Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update Meter Maintenance - Third Party Pipeline Notice
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Meter Maintenance - Third Party Pipeline Notice
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Hall Summit Expansion Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Location 21805
SEV 2/5
Operational Alert
1 Days
Gulf South Pipeline issued a Critical Over-Under Performance notice effective 08/14/2026 at 2:00 PM through 08/15/2026 9:00 AM, citing a customer's failure to take confirmed quantities at Location 21805, Discovery Gas Transmission. Gulf South will apply scheduling reductions for remaining nomination cycles on Gas Day 8/14 and until further notice based on projected daily quantities. Live capacity data for this location on the prior gas day (2026-08-13, td11 cycle) showed 0.139 Bcf/d scheduled against 0.250 Bcf/d operating capacity, suggesting a modest-volume interconnect with meaningful headroom before the event began.
This failure-to-take event at the Discovery Gas Transmission interconnect (~0.139 Bcf/d scheduled as of the prior gas day) is a localized, short-duration scheduling reduction with no stated capacity volume and no material Henry Hub or Gulf Coast basis implication; no trading action warranted.
Reroute: Moderate: Gulf South serves this corridor with multiple receipt alternatives including offshore gatherers and Haynesville-origin receipts; Discovery Gas Transmission volumes are modest and other receipt points can absorb scheduling adjustments.
View original notice text Loading…
Gulf South Pipeline
Update: Boardwalk Inbound Email Outage
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Boardwalk Inbound Email Outage
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Longview #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Vixen Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Longview #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Black Creek Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Harrisville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Hall Summit Legacy and Expansion Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 08/07/2026 - 08/13/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Safe Harbor Waiver - Loc 24329 Stratton Ridge
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 198 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Location 23091
SEV 2/5
Operational Alert
1 Days
Gulf South Pipeline issued an Over-Under Performance notice for Gas Day 8/7/2026 indicating that Nucor Steel Mill (Location 23091) failed to take confirmed quantities. Gulf South anticipates scheduling reductions for remaining nomination cycles on 8/7/2026 and until further notice based on projected daily quantities. No specific volume figure is stated and the affected customer is a single industrial end-user with no LNG or major market implications.
Single industrial customer failure-to-take at a steel mill delivery point on Gulf South has no material Henry Hub or regional basis implication; no actionable trading signal.
Reroute: Not applicable -- this is a downstream delivery failure at a single industrial customer meter, not a pipeline capacity constraint requiring reroute assessment.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Location 9154
SEV 2/5
Operational Alert
1 Days
Gulf South Pipeline has issued a Critical Over-Under Performance notice for Gas Day 8/7/2026 due to a customer's failure to take confirmed quantities at Location 9154, Sabine Fee #1 Well. Gulf South is implementing scheduling reductions for remaining nomination cycles on 8/7/2026 and until further notice based on projected daily quantities. No specific volume restriction is stated and the event appears limited to a single well receipt point.
Single-well receipt point under-performance on Gulf South with no stated volume impact -- localized nomination management issue with no discernible Henry Hub or regional basis signal.
Reroute: Not applicable -- this is a receipt-point under-performance at a single well; no reroute is relevant as the constraint is on production uptake, not pipeline transmission capacity.
View original notice text Loading…
Gulf South Pipeline
Update: Meter Maintenance - Third Party Pipeline Notice
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update Meter Maintenance - Third Party Pipeline Notice
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Safe Harbor Waiver - Loc 24329 Stratton Ridge.
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Westlake Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Carthage #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Hall Summit Legacy Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 07/31/2026 - 08/06/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update Meter Maintenance - Third Party Pipeline Notice
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Meter Maintenance - Third Party Pipeline Notice
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 24329 Stratton Ridge to Freeport LNG
SEV 4/5
Operational Alert
Until Further Notice
Gulf South Pipeline is notifying customers of a failure to take confirmed quantities at Location SLN 24329 Stratton Ridge (to Freeport LNG) in Area 25, effective Gas Day 8/4/2026. Confirmation reductions are anticipated for all remaining nomination cycles for 8/4/2026 and until further notice. No specific volume is stated, but the delivery point explicitly names Freeport LNG, triggering the LNG feedgas floor.
Freeport LNG is failing to take confirmed feed gas volumes at Stratton Ridge via Gulf South, reducing LNG export pull and leaving gas onshore -- bearish for Henry Hub and Gulf Coast basis until Freeport resumes taking confirmed quantities.
Reroute: Moderate: Gulf South interconnects with Southern Natural (EGT), Transco, and Tennessee Gas Pipeline for Gulf Coast and Southeast markets, but displaced Freeport LNG feed gas volumes have no alternative LNG export outlet in this corridor -- volumes will simply remain in the domestic supply pool.
View original notice text Loading…
Gulf South Pipeline
Safe Harbor Waiver - Loc 24329 Stratton Ridge
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 24329 Stratton Ridge to Freeport LNG
SEV 4/5
Operational Alert
Until Further Notice
Gulf South Pipeline has issued a critical Over-Under Performance notice (Notice 5038516) for Location SLN 24329 - Stratton Ridge (to Freeport LNG) in Area 25, effective 08/03/2026 at 3:20 PM CDT. Freeport LNG is failing to take confirmed quantities at this delivery point, and Gulf South is reducing confirmations for remaining nomination cycles for Gas Day 8/3/2026 and until further notice. No specific volume curtailment is stated, but the open-ended 'until further notice' language signals this is an ongoing, unresolved operational issue at the Freeport LNG feed gas lateral.
Freeport LNG feed gas curtailment via Gulf South Stratton Ridge lateral is active until further notice -- gas stays in the domestic market, applying bearish pressure to Henry Hub and Gulf Coast cash basis with no stated restoration timeline.
Reroute: None: this lateral explicitly serves Freeport LNG; if Freeport LNG is not taking gas, no alternative delivery destination replaces LNG export demand, and the curtailed volumes remain in the domestic supply pool.
View original notice text Loading…
Gulf South Pipeline
Update: Index 198 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Delhi Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
ID2 Cycle Scheduling Delay - Gas Day 7/31/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 302 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 9311 Westlake: Lake Charles Power Pla
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Meter Maintenance - Third Party Pipeline Notice
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Meter Maintenance - Third Party Pipeline Notice
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 816-1 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 07/24/2026 - 07/30/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Unplanned Bistineau Compressor & Storage Field Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned Index 201 Pipeline Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 9311Westlake: Lake Charles South Pla
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
TMY Scheduled Quantities Posting Delayed for Gas Day 7/28/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
EVE Cycle for 7/28/2026 Nomination Deadline Extended
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 296 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Mira Compressor Station Maintenance
SEV 1/5
Informational
Not scored -- last_updated is more than 24h old, treated as historical backlog rather than a live trading signal. No Claude API call was made for this notice.
Not scored -- notice too old to be actionable.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 330 Pipeline Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 818 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Tallulah Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Carthage Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 24329 Stratton Ridge to Freeport LNG
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Various Locations
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 1-2 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 330 Pipeline Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 07/17/2026 - 07/23/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
System Wide Alert - Limited Operational Flexibility
SEV 2/5
Informational
Gulf South Pipeline issued a System Wide Alert for Limited Operational Flexibility (Notice 5038424), originally posted 2026-07-15 and now on its third revision as of 2026-07-22. No specific capacity volumes, curtailment language, force majeure declaration, new affected locations, or restoration timeline are provided in this revision. The notice body contains no new operational information beyond the original alert.
No new market impact -- operational situation unchanged from prior revision, market has already priced this constraint.
Reroute: Moderate: Southern Natural Gas (EGT), Transco, and Tennessee Gas Pipeline serve overlapping Gulf Coast and Southeast markets that Gulf South supplies, providing partial reroute options if specific constraints were identified; however, no specific constrained segment or volume is stated in this notice.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 20862 Calcasieu Power Lake Charles
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Interconnecting Location
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Interconnecting Location
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
GasQuest and Informational Postings – URL Updates
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Bistineau Compressor & Storage Field Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 46 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Wilson Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Wilson Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 131 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 300 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 301-8-L-A Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned Bistineau Compressor & Storage Field Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Westlake Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Longview #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Carthage #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 266-L Pipeline Incident
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Delhi Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Moss Point Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Airport Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 287 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Hall Summit Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 129 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 1-2 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 198 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Carthage Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Measurement Update
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Mira Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Hall Summit Legacy Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Harrisville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 816-1 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 24329 Stratton Ridge to Freeport LNG
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 24329 Stratton Ridge to Freeport LNG
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
TMY Scheduled Quantities Posting Delayed for Gas Day 7/16/2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 07/10/2026 - 07/16/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
System Management Plan – Location 24329 Stratton Ridge (to Freeport LNG)
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at 20862 Calcasieu Power Lake Charles
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
EVE Cycle Scheduling Delay - Gas Day 7/14/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
ID2 Cycle Scheduling Delay - Gas Day 7/13/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 9153 Firestone Plant @ Lake Charles
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
TMY Scheduled Quantities Posting Delayed for Gas Day 7/11/2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
EVE Cycle for 7/11/2026 Nomination Deadline Extended
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Safe Harbor Waiver - Loc 24329 Stratton Ridge
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned Vixen Compressor Station Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 21737 Calcasieu Industries
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 20862 Calcasieu Power Lake Charles
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Safe Harbor Waiver - Loc 24329 Stratton Ridge
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 21737 Calcasieu Industries
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned Vixen Compressor Station Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Hall Summit Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 330 Pipeline Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 07/03/2026 - 07/09/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
TMY Scheduled Quantities Posting Delayed for Gas Day 7/8/2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
EVE Cycle for 7/8/2026 Nomination Deadline Extended
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 300 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 20862 Calcasieu Power Lake Charles
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned Longview #2 Compressor Station Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 06/26/2026 - 07/02/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Tallulah Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Carthage Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Black Creek Compressor Statiom Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Safe Harbor Waiver - Loc 24329 Stratton Ridge
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities- Loc 20862 (Calcasieu Power Lake Charles)
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 1-2 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 198 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 133 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 06/19/2026 - 06/25/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 20862 Calcasieu Power Lake Charles
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
TMY Scheduled Quantities Posting Delayed for Gas Day 6/24/2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Gulf South 6/24/2026 EVE Nomination Deadline Extension
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Lightning Strike at Hall Summit Compressor Station
SEV 3/5
Compressor Issue
0.400 Bcf/d
Until Further Notice
A lightning strike has taken Hall Summit Compressor Station in Gulf South Area 17 offline or to partial operation, creating above-normal upstream pressures and potentially curtailing up to 0.400 Bcf/d of throughput through the Hall Summit Compressor East Receipt Scheduling Group. No restoration timeline has been provided; Gulf South is actively working repairs. This is an unplanned event with no end date, effective immediately as of June 23, 2026.
Unplanned lightning strike removes up to 0.400 Bcf/d of Gulf South Area 17 eastbound capacity with no restoration timeline; expect bullish pressure on Transco Zone 4 and Henry Hub basis as Haynesville and Gulf Coast volumes are constrained from moving downstream into Southeast markets.
Reroute: Moderate: Southern Natural Gas (EGT) and Transco serve overlapping Gulf Coast and Southeast markets and may absorb some diverted volumes, but specific Haynesville Area 17 receipt combinations served by Gulf South limit full substitution, and both alternatives may have limited spare capacity.
View original notice text Loading…
Gulf South Pipeline
Update: Index 270-65 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Lightning Strike at Hall Summit Compressor Station
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Loc 21805
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Loc 21805
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 24329 Stratton Ridge to Freeport LNG
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 296 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Loc 20862
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Delhi Compressor Station Maintenance
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 06/12/2026 - 06/18/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Delhi Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Montz Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 1-2 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 818 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 817 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 817 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 817 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 24329 Stratton Ridge to Freeport LNG
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 330 Pipeline Maintenance
SEV 3/5
Maintenance
0.175 Bcf/d
Until Further Notice
40 Days
Gulf South Pipeline is performing planned maintenance on the Index 330 Pipeline segment in South-Central Louisiana (St. Martinville, Opelousas, Henderson-Cecilia area) from June 15 to July 25, 2026. Seven delivery points plus five farmtaps will be shut-in for the full duration, with capacity in the Arnaudville to Bayou Sale Scheduling Group impacted by up to 175,000 Dth/d (0.175 Bcf/d) from June 16 through July 24. The notice explicitly states that all service classes, including Primary Firm Service, are at risk.
Gulf South planned maintenance removes up to 0.175 Bcf/d from the Arnaudville-to-Bayou Sale corridor through July 24, with Primary Firm Service at risk; watch for mild bullish pressure at Transco Zone 4 and Henry Hub as South Louisiana distribution demand competes for alternative supply paths over a 40-day window.
Reroute: Moderate: Southern Natural Gas (EGT) and Transco serve overlapping South Louisiana and Southeast markets and may absorb some displaced volumes, but the localized distribution-level nature of the shut-in points (city gates, farmtaps) limits the practical ability of shippers to reroute end-use deliveries.
View original notice text Loading…
Gulf South Pipeline
Index 387 Pipeline Maintenance
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Safe Harbor Waiver - Loc 24329 Stratton Ridge
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 06/05/2026 - 06/11/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Location 12775
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Carthage Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Carthage Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Safe Harbor Waiver - Loc 24329 Stratton Ridge
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure To Take Confirmed Quantities - Loc 24329 Stratton Ridge to Freeport LNG
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Location 23074
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Hall Summit Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Vixen Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Delhi Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Delhi Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Delhi Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Carthage #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 387 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Tallulah Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 296 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Mira Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 270-65 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 300 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Clarence Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Hall Summit Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 133 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 266-L Pipeline Incident
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 198 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Montz Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 301-18 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 301-6 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
ID1 Scheduled Quantities Posting Delayed 6/5/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Intra Day 2 Cycle for 6/5/2026 Nomination Deadline Extended
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
ID1 Scheduled Quantities Posting Delayed 6/5/2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
ID1 Scheduled Quantities Posting Delayed 6/5/2026
SEV 1/5
Seeded
Seeded on first parser run -- alert suppressed.
No alert -- historical backfill.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Safe Harbor Waiver - Loc 24329 Stratton Ridge
SEV 1/5
Seeded
Seeded on first parser run -- alert suppressed.
No alert -- historical backfill.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 301-6 Pipeline Maintenance
SEV 1/5
Seeded
Seeded on first parser run -- alert suppressed.
No alert -- historical backfill.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Carthage Compressor Station Maintenance
SEV 1/5
Seeded
Seeded on first parser run -- alert suppressed.
No alert -- historical backfill.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 818 Pipeline Maintenance
SEV 1/5
Seeded
Seeded on first parser run -- alert suppressed.
No alert -- historical backfill.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Failure to Take Confirmed Quantities at Various Locations
SEV 1/5
Seeded
Seeded on first parser run -- alert suppressed.
No alert -- historical backfill.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
TMY Scheduled Quantities Posting Delayed for 6/2/2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Various Locations
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Safe Harbor Waiver - Loc 24329 Stratton Ridge
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 05/29/2026- 06/04/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned: Index 129 Pipeline Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 70-15 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 05/29/2026- 06/04/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 05/22/2026- 05/28/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Location 21738
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Various Locations
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
TMY Scheduled Quantities Posting Delayed for 5/27/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
The ID2 Scheduled Quantities Posting Delayed 5/26/2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Tallulah Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Location 20862
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Various Locations
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 266L & Index 266L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Hall Summit Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 817 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 817 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 817 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 818 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 3011 Lake Charles Refinery (Citgo)
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Safe Harbor Waiver - Loc 24329 Stratton Ridge.
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 05/15/2026- 05/21/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Wilson Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 3011 Lake Charles Refinery (Citgo)
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Wilson Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 266L & Index 266L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 266-L Pipeline Incident
SEV 3/5
Force Majeure
Until Further Notice
On May 14, 2026 at approximately 9:30 PM, Gulf South Pipeline detected a gas release on Line 266-L in Jackson and Ouachita parishes, northern Louisiana, and immediately shut down the affected section. Multiple well locations and one ATMOS farm tap are scheduled to zero with no restoration timeline -- repairs must be completed and safety/regulatory requirements met before the line returns to service. This is a Revision 1 supersede notice referencing Prior Notice 5038138, confirming the event is ongoing.
Unplanned pipeline incident on Gulf South Line 266-L removes multiple northern Louisiana Haynesville-area receipt locations from service with no restoration date; no specific volume stated but supply curtailment is mildly bullish for Henry Hub and Transco Zone 4 basis until repairs are complete.
Reroute: Moderate: Southern Natural Gas (EGT), Transco, and Tennessee Gas Pipeline serve overlapping Gulf Coast and Southeast markets from the Louisiana production area, but the specific well and farm tap receipts zeroed on Line 266-L are tied directly to this gathering segment and cannot be rerouted without alternative gathering connectivity at the wellhead level.
View original notice text Loading…
Gulf South Pipeline
Pipeline Incident Impacting Service
SEV 3/5
Operational Alert
Until Further Notice
Gulf South Pipeline detected a gas release on Line 266-L in Jackson and Ouachita parishes, northern Louisiana at approximately 9:30 PM on May 14, 2026, prompting an immediate line shutdown and temporary residential evacuations. The affected section will remain offline until repairs are complete and all safety and regulatory requirements are satisfied, with no restoration timeline provided. Locations Townsend #1 Well (Loc 21228) and one ATMOS Farm Tap have been scheduled to zero effective May 15, 2026.
Unplanned pipeline incident on Gulf South Line 266-L removes an indeterminate volume of northern Louisiana supply with no restoration timeline, applying mild bullish pressure at Henry Hub and Transco Zone 4 Southeast basis; no specific capacity figure disclosed so market impact is primarily sentiment-driven until further updates quantify the outage.
Reroute: Moderate: Southern Natural Gas (EGT), Transco, and Tennessee Gas Pipeline serve overlapping Gulf Coast and Southeast markets, providing partial alternatives for affected shippers, though the specific receipt-point scheduling zeros at Townsend #1 Well and the ATMOS Farm Tap limit the volumes that can be physically rerouted.
View original notice text Loading…
Gulf South Pipeline
Update: Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 129 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 266 & Index 266L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 05/08/2026- 05/14/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 9311 Westlake: Lake Charles
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 3011 Lake Charles Refinery
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Wilson Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Safe Harbor Waiver - Loc 24329 Stratton Ridge.
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 287 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities - Loc 3263, Loc 20709, Loc 9153, Loc 3011
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to take confirmed quantities Loc 3011, Loc 20709, Loc 9153
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 130 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Failure to take confirmed quantities - Loc 20862 Calcasieu Power Lake Ch
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Failure to take confirmed quantities - Loc 20862 Calcasieu Power Lake Ch
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 301-18 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 05/01/2026- 05/07/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 04/24/2026 - 04/30/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Carthage #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 205 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 249-1 Pipeline Maintanence
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Wilson Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 05/01/2026- 05/07/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
White Oak Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Rodrigue Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 131 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Black Creek Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 04/17/2026 - 04/23/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned Bistineau Compressor & Storage Field Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Black Creek Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Carthage #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 129 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Petal Compressor and Storage Field Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Westlake Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 129 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Montz Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 819-2 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Rodrigue Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 70-4 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 301-18 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 04/10/2026 - 04/16/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update:Index 70-7 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update:Index 70-6 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 129-20 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Olla Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Tallulah Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 270-L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Kiln Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 70-8 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 70-5 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 70 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 59-8 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 131 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Marksville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Wilson Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Rodrigue Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Rodrigue Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Carthage #2 Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 133 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 192 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Index 270-65 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 131 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Carthage Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Kiln Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Tallulah Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Hall Summit Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Update: Index 129 Pipeline Maintenance
SEV 3/5
Maintenance
0.770 Bcf/d
Until Further Notice
11 Days
Gulf South Pipeline is performing planned maintenance on the Index 129 Pipeline from May 10 to May 21, 2026. North-to-south capacity on the West 30 segment (Goodrich to South Texas deliveries) will be reduced by up to 0.770 Bcf/d, with south-to-north capacity through Goodrich compressor station impacted by up to 0.180 Bcf/d. The maintenance has the potential to affect all service classes including Primary Firm Service, with specific shut-ins at Loc 12780 (Teco Polk County - Enterprise) and 12 CenterPoint Farm Taps.
Gulf South planned maintenance removes up to 0.770 Bcf/d of north-to-south capacity on the West 30 segment for 11 days starting May 10; watch for basis widening at Transco Zone 4 and Henry Hub versus Southeast delivery points, with Primary Firm Service at risk creating potential for physical tightness in the South Texas corridor.
Reroute: Moderate: Southern Natural Gas (EGT) and Transco serve overlapping Gulf Coast and Southeast markets and may absorb some displaced volumes, but the 0.770 Bcf/d magnitude of the north-to-south restriction and simultaneous southbound and northbound impacts may limit full offset, particularly for South Texas delivery points.
View original notice text Loading…
Gulf South Pipeline
Paris Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 129 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 129 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned Index 129 Pipeline Maintenane
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Hall Summit Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Index 301-8-11-L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Mccomb Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Harrisville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 130 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Arnaudville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 818 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Index 330 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 04/03/2026 - 04/09/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 819-2 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 301-6 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Westlake Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 287-5 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 302 Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned Index 129 Pipeline Maintenane
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure To Take Confirmed Quantities - Loc 24329 Stratton Ridge to Freeport LNG
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Montz Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned Index 391-1-L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Montz Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Airport Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Harrisville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 03/27/2026 - 04/02/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Mccomb Compressor Station Maintenance
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Harrisville Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Revised: Heidelberg Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Unplanned Index 391-1-L Pipeline Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Black Creek Compressor Station Maintenance
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Index 59-22 Meter Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Delhi Compressor Station Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
About Gulf South Pipeline
A Gulf Coast system serving industrial, power and LNG demand, with large storage in Mississippi and Louisiana.
Operated by Boardwalk Pipelines Runs Texas along the Gulf Coast through Louisiana, Mississippi and Alabama to the Florida Panhandle Trading points Gulf South, Perryville, Henry Hub area Mapped facilities Hall Summit
Gulf South Pipeline Hall Summit
Line from EIA pipeline data; dots are facilities named in this pipeline’s notices (HIFLD locations). Dashed lines are schematic.
New to pipeline notices? How to read a notice ·
Glossary ·
Get alerts for Gulf South Pipeline ·
Capacity offline on all pipelines