Eastern Gas Transmission & Storage

Every active notice for Eastern Gas Transmission & Storage, newest first.

Eastern Gas Transmission & Storage (U.S.): 143 active notices, 1 rated severity 4–5; 7 posted in the last 7 days. No outages in effect on the Capacity Offline ledger today.

Showing 143 notices

Free: this page refreshes several times a day (delayed) — email & Telegram alerts on a 1-hour delay, severity 4–5 only. Pro ($149/mo): Real-time alerts within ~2 minutes of posting, full AI trading note. See plans →

Every active notice for Eastern Gas Transmission & Storage, newest first. ← Back to the Eastern Gas Transmission & Storage summary

EGTS

EPSQ Overrides for Parks and Loans

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Intra Cycle Setpoint Change Requests

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Return to Two Operational Impact Areas Effective November 1, 2026

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Winter Period Injections Effective November 1, 2026

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Valley Gate and PL-1 Restriction Guidance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Valley Gate Restriction

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Lightburn Extraction Plant Returned to Service

SEV 3/5
lifted ✓ Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

September Imbalance Payback Postponed

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

TL-360 Receipt Capacity Constraint

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Hastings Extraction Plant Return to Service

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

NIMO East and Bethlehem Energy Center Restrictions

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Oakford Storage Complex Returned to Service

SEV 2/5
lifted ✓ Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Hastings Extraction Plant Unplanned Maintenance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Hastings Extraction Plant Operations

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Lightburn Extraction Plant Planned Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

System Alert – Transportation Due Shipper Imbalances

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Oakford Storage Complex Unplanned Maintenance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

EGTS Loudoun Deliveries

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

EGTS Loudoun Deliveries

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Brookman Corners Station Unit #4 Return to Service

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Brookman Corners Station Unit #4 Unplanned Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

TL-400 Restrictions Remain in Effect

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Steuben Station Maintenance Completed

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

TL-265 Planned Maintenance Complete

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

TL-400 Restrictions Remain in Effect

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Groveport Compressor Station Unplanned Maintenance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

T-Pool Balancing Advisory

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

TL-400 Restrictions Remain in Effect

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Hastings Extraction Plant Planned Maintenance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Groveport Compressor Station Returned to Service

SEV 2/5
lifted ✓ Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Hastings Extraction Plant Return to Service

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Steuben Station Maintenance and Restrictions

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Chambersburg Compressor Station Unplanned Maintenance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Centre Compressor Station Planned Maintenance

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

TL-400 Restrictions Remain in Effect

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Centre Compressor Station Returned to Service

SEV 2/5
lifted ✓ Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

LN-19 & LN-20 Receipt Capacity Constraint

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Chambersburg Compressor Station Maintenance Update

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Chambersburg Compressor Station Returned to Service

SEV 2/5
lifted ✓ Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

System Alert

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

System Alert Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Clarington Delivery Restrictions

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Clarington Restrictions Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

T-Pool Balancing Advisory Reminder

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

TL-265 Planned Maintenance Impacts

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Hastings Extraction Plant Remains Out of Service

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Hastings Extraction Plant Return to Service

SEV 1/5
Informational
View original notice text
Loading…
EGTS

Hastings Extraction Plant Planned Maintenance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

TL-400 Restrictions Remain in Effect

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Over-Injection and T-Pool Balancing Advisory

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Oakford Area Restrictions

SEV 3/5
Capacity Constraint Until Further Notice

EGTS has issued a Critical capacity constraint notice for the Oakford area, effective January 12, 2026. Oakford is a major storage and transmission hub in western Pennsylvania serving Mid-Atlantic and Appalachian markets. No specific capacity volumes or restoration timeline are provided in the notice text.

EGTS Oakford area restriction tightens Appalachian Mid-Atlantic supply with no stated restoration date; expect bullish pressure on Dominion South and TETCO M2 basis vs Henry Hub.
Reroute: Moderate: TCO and Equitrans serve overlapping Appalachian markets, and Transco provides some Mid-Atlantic alternative capacity, but Oakford is a critical storage hub with limited full bypass options.
View original notice text
Loading…
EGTS

OFO – Under Performance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

OFO ADVISORY PL-1 FTNN Hourly

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

OFO Advisory Northern FTNN Hourly

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Northern Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Limited Daily and Hourly Flexibility – Manage Receipts and Deliveries

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

System Alert – Limited Flexibility

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Leidy Area Restrictions Revision

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

OFO: Northern Area Conform Services

SEV 4/5
Operational Alert Until Further Notice

EGTS has issued an Operational Flow Order (OFO) for Conform Services on its Northern Area, effective January 23, 2026 at 15:00. This is a Critical-category notice indicating active system stress requiring shippers to conform nominations to actual usage. No specific capacity volume is stated, but OFO declarations on EGTS Northern Area signal tightness in Appalachian Mid-Atlantic supply flows. Duration is indeterminate from this notice.

EGTS Northern Area OFO signals active system stress on the Appalachian/Mid-Atlantic corridor; expect bullish pressure at Dominion South and TETCO M2 basis with potential tightening at Mid-Atlantic delivery points served by EGTS and Transco Zone 5.
Reroute: Moderate: TCO (Columbia Gas Transmission) and Equitrans serve overlapping Appalachian markets and may absorb some volumes, but EGTS Northern Area OFOs during winter typically reflect system-wide tightness that limits available reroute capacity on competing pipes.
View original notice text
Loading…
EGTS

OFO: Northern Area FTNN Hourly

SEV 3/5
Operational Alert Until Further Notice

EGTS has issued an Operational Flow Order (OFO) for the Northern Area requiring hourly FTNN (Firm Transportation No-Notice) compliance, effective January 23, 2026 at 15:00. This is a first-time notice (Revision 1) indicating system stress in the Northern Area of the Eastern Gas Transmission and Storage system. No capacity volume or restoration timeline is specified.

EGTS Northern Area OFO signals Mid-Atlantic/Appalachian supply tightness -- watch for basis widening at Dominion South and TETCO M2 versus Henry Hub, with potential spillover into Transco Zone 5 if EGTS cannot balance flows.
Reroute: Moderate: TCO (Columbia Gas Transmission) and Equitrans serve overlapping Appalachian markets, and Transco provides partial Mid-Atlantic alternative; however, EGTS Northern Area OFOs during winter demand periods often reflect system-wide tightness that limits the effectiveness of reroutes.
View original notice text
Loading…
EGTS

OFO: PL-1 Conform Services

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

OFO: PL-1 System FTNN Hourly

SEV 3/5
Operational Alert Until Further Notice

EGTS has issued an Operational Flow Order (OFO) on its PL-1 system requiring FTNN (Flowing Today, Nominated Nomination) hourly compliance, effective 2026-01-23 at 15:00. This is a first-revision notice posted in January 2026, indicating active system stress on the EGTS Mid-Atlantic/Appalachian network. No specific capacity volume is stated, and no restoration timeline is given.

EGTS PL-1 OFO with hourly FTNN requirements signals Mid-Atlantic/Appalachian pipeline stress; watch for basis widening at Dominion South and TETCO M2 vs Henry Hub, with potential tightening for downstream Southeast and Mid-Atlantic markets served by EGTS and interconnecting TCO and Transco.
Reroute: Moderate: TCO (monitored) and Equitrans serve overlapping Appalachian markets, and Transco provides partial Mid-Atlantic alternative; however, simultaneous winter demand pressure across the region may limit available spare capacity on alternative pipes.
View original notice text
Loading…
EGTS

PL-1 Restrictions

SEV 3/5
Capacity Constraint Until Further Notice

EGTS has issued a Critical Pipeline Conditions notice for PL-1 Restrictions effective January 23, 2026. The notice indicates a capacity constraint on the EGTS system, which serves Mid-Atlantic and Appalachian markets including West Virginia, Virginia, Pennsylvania, Maryland, and New York. No specific volume or restoration timeline is provided in the notice text.

EGTS PL-1 capacity constraint tightens Appalachian and Mid-Atlantic supply; watch for basis widening at Dominion South and TETCO M2 versus Henry Hub with no stated restoration timeline.
Reroute: Moderate: TCO and Equitrans serve overlapping Appalachian markets, and Transco provides partial Mid-Atlantic alternative, but EGTS serves specific local distribution points that may have limited bypass options.
View original notice text
Loading…
EGTS

TL-400 Restrictions Remain in Effect

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Cornwell and Clarington Restrictions

SEV 2/5
Capacity Constraint

EGTS issued a critical notice on January 26, 2026, effective January 28, 2026, citing capacity constraints at Cornwell and Clarington locations on the Eastern Gas Transmission and Storage system. No specific capacity volumes, curtailment levels, or restoration timeline are provided in the notice text. Insufficient detail to assess market impact beyond a localized Appalachian constraint.

No capacity volume or curtailment detail provided; monitor for follow-on revisions, but this notice alone offers no actionable basis signal at Dominion South or TETCO M2.
Reroute: Moderate: TCO and Equitrans serve overlapping Appalachian markets in the WV/PA/OH corridor, providing partial reroute options if volumes are specified in a subsequent revision.
View original notice text
Loading…
EGTS

January 2026 Balancing Services

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Leidy Area Restrictions Revision

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Southern & Central City Gate Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

TL-360 Receipt Capacity Constraint Remains in Effect

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Southern & Central City Gate Restrictions Revision

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Southern & Central City Gate Restrictions Revision

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

OFO – Under Performance Revision

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

System Alert – Inventory Transfers

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

System Alert – Inventory Transfers

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Limited Daily and Hourly Flexibility: Manage Receipts and Deliveries

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Groveport Compressor Station Unplanned Maintenance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Elimination of Minimum Turnover Obligation for All GSS Rate Schedules

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

OFO – Under Performance Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

OFO: PL-1 System FTNN Hourly Termination

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

OFO: Northern Area Conform Services Termination

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

OFO: Northern Area FTNN Hourly Terminated

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

OFO: PL-1 Conform Services Termination

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

February 2026 Balancing Services

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Leidy Area Restrictions Revision

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Leidy Area Restrictions Revision

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Southern and Central City Gate Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions Revision

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Northern Area Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

OFO ADVISORY Northern FTNN Hourly Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

OFO ADVISORY PL-1 FTNN Hourly Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Southern & Central City Gate Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Northern Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

OFO – Under Performance

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Southern and Central City Gate Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

OFO – Under Performance Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Limited Daily and Hourly Flexibility: Manage Receipts and Deliveries

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Northern Area Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Leidy Area Restrictions Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Oakford Area Restrictions Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Valley Gate Restriction

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Valley Gate and PL-1 Restriction Guidance Reminder

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Oakford Area Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Leidy Area Restrictions Revision

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Northern Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

TL-360 Receipt Capacity Restriction Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Limited Daily and Hourly Flexibility: Manage Receipts and Deliveries

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

System Alert Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

System Alert Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Northern Area Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

PL-1 Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Oakford Area Restrictions Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Leidy Area Restrictions Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Return to One Operational Impact Area

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Notice of Revised Fuel Retention Percentages

SEV 1/5
Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Valley Gate Restriction Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Cornwell and Clarington Restrictions Termination

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

TL-400 Restrictions

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Valley Gate and PL-1 Restriction Guidance Reminder Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Over-Injection and T-pool Balancing Advisory Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

System Alert – Limited Flexibility Terminated

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

OFO Advisory: PL-1 FTNN Termination

SEV 3/5
Informational Until Further Notice

Pre-screen severity 3 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Tennessee Gas Pipeline EDI Issue

SEV 2/5
Informational

Pre-screen severity 2 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…
EGTS

Tennessee Gas Pipeline EDI Issue - Resolved

SEV 1/5
lifted ✓ Informational

Pre-screen severity 1 -- below full-score threshold.

Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text
Loading…

About Eastern Gas Transmission & Storage

Eastern Gas Transmission & Storage (formerly Dominion Transmission) gathers Appalachian supply and operates large storage serving Mid-Atlantic markets, including the Cove Point LNG terminal.

Operated by
Berkshire Hathaway Energy
Runs
Pennsylvania, West Virginia, Ohio, New York, Maryland and Virginia
Trading points
Eastern Gas South, Eastern Gas North
Eastern Gas Transmission (EGTS)

Line from EIA pipeline data; dots are facilities named in this pipeline’s notices (HIFLD locations). Dashed lines are schematic.