Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

MGU - Marshall Interconnect

Vector Pipeline · Loc VX040 · Michigan
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
-0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.000
Bcf/d
30-day average
-0.000
30 of 30 days posted
30-day high
-0.000
Nov 26
30-day low
-0.003
Oct 31
Operating capacity
0.035
Bcf/d as posted, timely cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Vector Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.003-0.002-0.0010.000Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 26-0.000+0.000
Nov 25-0.000+0.000
Nov 24-0.000+0.000
Nov 23-0.000+0.000
Nov 22-0.000+0.000
Nov 21-0.000+0.000
Nov 20-0.000+0.000
Nov 19-0.000+0.000
Nov 18-0.000+0.000
Nov 17-0.000+0.000
Nov 16-0.000+0.000
Nov 15-0.000+0.000
Nov 14-0.000+0.000
Nov 13-0.000+0.000
Nov 12-0.000+0.000
Nov 11-0.000+0.000
Nov 10-0.000+0.000
Nov 9-0.000+0.000
Nov 8-0.000+0.000
Nov 7-0.000+0.000
Nov 6-0.000+0.000
Nov 5-0.000+0.000
Nov 4-0.000+0.000
Nov 3-0.000+0.000
Nov 2-0.000+0.000
Nov 1-0.000+0.003
Oct 31-0.003+0.000
Oct 30-0.003+0.000
Oct 29-0.003+0.000
Oct 28-0.003—
88 more days on file for this meter, back to August 1, 2026. Full meter-level history is part of Institutional (API and downloads).
Vector Pipeline

Vector PipelineState only (Michigan) — the meter's exact site is not geocoded; the ring marks the state, not the point.

No recent notices matched or named this point, and no severity 3+ notices on Vector Pipeline in the last 30 days. See all Vector Pipeline notices.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, MGU - Marshall Interconnect (Vector Pipeline loc VX040) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/vector/vx040/