Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

La Porte

Vector Pipeline · Loc LP151 · LA PORTE, Indiana
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.042
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.042
Bcf/d
30-day average
0.038
30 of 30 days posted
30-day high
0.060
Nov 10
30-day low
0.000
Oct 31
Operating capacity
0.151
Bcf/d as posted, timely cycle
Utilization
28%
headroom 72%

Scheduled quantities as posted by Vector Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0200.0400.0600.080Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.042+0.000
Nov 250.042+0.000
Nov 240.042+0.000
Nov 230.042+0.000
Nov 220.042+0.000
Nov 210.042+0.000
Nov 200.042+0.020
Nov 190.022+0.000
Nov 180.022-0.020
Nov 170.042-0.015
Nov 160.057+0.000
Nov 150.057+0.000
Nov 140.057-0.004
Nov 130.060+0.013
Nov 120.047+0.000
Nov 110.047-0.013
Nov 100.060+0.008
Nov 90.053+0.000
Nov 80.053+0.000
Nov 70.053+0.011
Nov 60.042+0.000
Nov 50.042+0.000
Nov 40.042+0.015
Nov 30.027-0.016
Nov 20.043+0.015
Nov 10.028+0.028
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000+0.000
Oct 280.000—
88 more days on file for this meter, back to August 1, 2026. Full meter-level history is part of Institutional (API and downloads).
Vector PipelineLa Porte

Vector PipelinePlaced at the center of La Porte, IN — approximate; the exact meter site is not published.

No recent notices matched or named this point, and no severity 3+ notices on Vector Pipeline in the last 30 days. See all Vector Pipeline notices.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, La Porte (Vector Pipeline loc LP151) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/vector/lp151/