Enercast — at the moment it matters
Home / Daily Summary / Storage / Meter

KM Keystone Storage

Transwestern Pipeline · Loc 78386 · Southwest
Storage injection / withdrawal · counted in Storage (also Storage)
Gas day Nov 27
+0.020
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
+0.012
Bcf/d
30-day average
+0.007
30 of 30 days posted
30-day high
+0.030
Nov 2
30-day low
+0.000
Nov 25
Operating capacity
0.211
Bcf/d as posted, evening cycle
Utilization
10%
headroom 90%

Scheduled quantities as posted by Transwestern Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.0000.0100.0200.0300.040Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.020+0.000
Nov 26+0.020+0.020
Nov 25+0.000+0.000
Nov 24+0.000-0.011
Nov 23+0.011-0.018
Nov 22+0.030+0.030
Nov 21+0.000+0.000
Nov 20+0.000+0.000
Nov 19+0.000-0.011
Nov 18+0.011+0.011
Nov 17+0.000+0.000
Nov 16+0.000+0.000
Nov 15+0.000+0.000
Nov 14+0.000-0.009
Nov 13+0.009-0.000
Nov 12+0.009+0.001
Nov 11+0.008-0.000
Nov 10+0.008+0.000
Nov 9+0.008+0.000
Nov 8+0.008+0.000
Nov 7+0.008-0.002
Nov 6+0.010+0.002
Nov 5+0.008+0.008
Nov 4+0.000+0.000
Nov 3+0.000-0.030
Nov 2+0.030+0.030
Nov 1+0.000-0.005
Oct 31+0.005+0.005
Oct 30+0.000+0.000
Oct 29+0.000—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Transwestern Pipeline

Transwestern PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Transwestern Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transwestern Pipeline notices →

Transwestern Pipeline · posted 2026-11-19 · effective 2026-11-19 · force majeure
Transwestern Pipeline declared force majeure effective November 19, 2026 at 7:15AM due to a compressor station mechanical failure on the West Texas Lateral. Lateral capacity is reduced from 0.830 Bcf/d to 0.750 Bcf/d, a net cut of 0.080 Bcf/d, through November 21, 2026 at 8:59AM.…
Transwestern Pipeline · posted 2026-11-17 · effective 2026-11-14 · informational
Transwestern Pipeline · posted 2026-11-16 · effective 2026-11-14 · force majeure
Transwestern Pipeline has extended its Force Majeure at the WT-0 Compressor Station (Hagerman, NM) from the originally posted single-day event (Gas Day Nov 15 only) through Gas Day November 17, 2026, now spanning three gas days. The mechanical failure reduces West Texas Lateral c…
Transwestern Pipeline · posted 2026-11-15 · effective 2026-11-14 · force majeure
Transwestern Pipeline declared a force majeure on Gas Day November 15, 2026 due to a mechanical failure at the WT-0 Compressor Station in Hagerman, NM, reducing West Texas Lateral capacity from 830,000 MMBtu/d (0.830 Bcf/d) to approximately 750,000 MMBtu/d (0.750 Bcf/d), a net cu…
Transwestern Pipeline · posted 2026-11-04 · effective 2026-10-27 · force majeure
Transwestern East Mainline force majeure, originally declared Oct 27 due to compressor station mechanical failure, has been extended again through Nov 9, 2026 (Revision 2). Capacity remains reduced from 750,000 MMBtu/d to 630,000 MMBtu/d (0.120 Bcf/d net cut), with restoration no…
Transwestern Pipeline · posted 2026-11-02 · effective 2026-11-03 · force majeure
Transwestern Pipeline declared a force majeure due to a compressor station mechanical failure west of Thoreau, reducing westbound capacity from 1.240 Bcf/d to 1.100 Bcf/d (a net cut of 0.140 Bcf/d) effective Gas Day November 3, 2026. The restriction is expected to remain in effec…
Transwestern Pipeline · posted 2026-11-02 · effective 2026-10-27 · force majeure
Transwestern East Mainline force majeure, originally declared Oct 27, has been extended through November 5, 2026 (was Nov 3). East Mainline capacity remains restricted from 750,000 MMBtu/d to 630,000 MMBtu/d, a net reduction of 0.120 Bcf/d. Restoration to full 0.750 Bcf/d capacit…
Transwestern Pipeline · posted 2026-10-28 · effective 2026-10-24 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, KM Keystone Storage (Transwestern Pipeline loc 78386) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tw/78386/