Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

GOLDEN VALLEY

Tuscarora Gas Transmission · Loc 312070 · WASHOE, Nevada
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.015
Bcf/d scheduled
Δ Day-over-day
+0.005
vs Nov 25
7-day average
0.011
Bcf/d
30-day average
0.023
30 of 30 days posted
30-day high
0.045
Nov 6
30-day low
0.000
Nov 19
Operating capacity
0.067
Bcf/d as posted, evening cycle
Utilization
23%
headroom 77%

Scheduled quantities as posted by Tuscarora Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0200.0400.060Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.015+0.005
Nov 250.010+0.000
Nov 240.010-0.003
Nov 230.013+0.000
Nov 220.013+0.000
Nov 210.013+0.008
Nov 200.005+0.005
Nov 190.000-0.038
Nov 180.038+0.003
Nov 170.035+0.035
Nov 160.000+0.000
Nov 150.000+0.000
Nov 140.000+0.000
Nov 130.000-0.035
Nov 120.035+0.000
Nov 110.035+0.000
Nov 100.035-0.005
Nov 90.040+0.000
Nov 80.040+0.000
Nov 70.040-0.005
Nov 60.045+0.010
Nov 50.035+0.000
Nov 40.035-0.005
Nov 30.040+0.010
Nov 20.030+0.000
Nov 10.030+0.000
Oct 310.030+0.019
Oct 300.011-0.028
Oct 290.040+0.010
Oct 280.029—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Tuscarora Gas TransmissionGOLDEN VALLEY

Tuscarora Gas TransmissionPlaced at the center of Washoe, NV — approximate; the exact meter site is not published.

No recent notices matched or named this point, and no severity 3+ notices on Tuscarora Gas Transmission in the last 30 days. See all Tuscarora Gas Transmission notices.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, GOLDEN VALLEY (Tuscarora Gas Transmission loc 312070) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tuscarora/312070/