Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

PECAN VERDE M3680 MP 117.5

Transco · Loc 9013004 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 27
0.088
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.094
Bcf/d
30-day average
0.069
30 of 30 days posted
30-day high
0.101
Nov 2
30-day low
0.006
Oct 30
Operating capacity
0.414
Bcf/d as posted, evening cycle
Utilization
21%
headroom 79%

Scheduled quantities as posted by Transco on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.088+0.000
Nov 260.087-0.011
Nov 250.099+0.001
Nov 240.098+0.003
Nov 230.095-0.001
Nov 220.095+0.001
Nov 210.095+0.017
Nov 200.077+0.000
Nov 190.077+0.001
Nov 180.076+0.004
Nov 170.072-0.006
Nov 160.078+0.000
Nov 150.078+0.000
Nov 140.078+0.026
Nov 130.052+0.009
Nov 120.043+0.000
Nov 110.043-0.041
Nov 100.084+0.000
Nov 90.084+0.000
Nov 80.084+0.000
Nov 70.084+0.075
Nov 60.009-0.074
Nov 50.083+0.040
Nov 40.043+0.001
Nov 30.042-0.059
Nov 20.101+0.010
Nov 10.091+0.070
Oct 310.021+0.015
Oct 300.006-0.013
Oct 290.020—
82 more days on file for this meter, back to August 8, 2026. Full meter-level history is part of Institutional (API and downloads).
Transco

TranscoState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Transco

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transco notices →

Transco · posted 2026-11-06 · effective 2026-11-10 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, PECAN VERDE M3680 MP 117.5 (Transco loc 9013004) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/transco/9013004/