Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

SHERRILL ROAD M3648 MP 240.52

Transco · Loc 9007242 · Texas
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
0.006
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.011
Bcf/d
30-day average
0.010
30 of 30 days posted
30-day high
0.026
Nov 6
30-day low
0.006
Nov 26
Operating capacity
0.228
Bcf/d as posted, evening cycle
Utilization
3%
headroom 97%

Scheduled quantities as posted by Transco on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0100.0200.030Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.006+0.000
Nov 250.006-0.008
Nov 240.014-0.007
Nov 230.021+0.015
Nov 220.006+0.000
Nov 210.006-0.015
Nov 200.021+0.015
Nov 190.006-0.013
Nov 180.019+0.013
Nov 170.006-0.010
Nov 160.016+0.010
Nov 150.006+0.000
Nov 140.006+0.000
Nov 130.006+0.000
Nov 120.006+0.000
Nov 110.006+0.000
Nov 100.006+0.000
Nov 90.006+0.000
Nov 80.006+0.000
Nov 70.006-0.020
Nov 60.026+0.020
Nov 50.006+0.000
Nov 40.006+0.000
Nov 30.006-0.007
Nov 20.013+0.000
Nov 10.013-0.004
Oct 310.017-0.000
Oct 300.017+0.011
Oct 290.006+0.000
Oct 280.006—
81 more days on file for this meter, back to August 8, 2026. Full meter-level history is part of Institutional (API and downloads).
Transco

TranscoState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Transco

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transco notices →

Transco · posted 2026-11-06 · effective 2026-11-10 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, SHERRILL ROAD M3648 MP 240.52 (Transco loc 9007242) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/transco/9007242/