Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

ABBEVILLE-SCEG M7166 MP 1151.36

Transco · Loc 1003399 · Anderson, South Carolina
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.001
Bcf/d scheduled
Δ Day-over-day
-0.001
vs Nov 25
7-day average
0.001
Bcf/d
30-day average
0.001
30 of 30 days posted
30-day high
0.002
Nov 16
30-day low
0.000
Nov 7
Operating capacity
0.027
Bcf/d as posted, evening cycle
Utilization
3%
headroom 97%

Scheduled quantities as posted by Transco on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0010.0010.0020.002Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.001-0.001
Nov 250.002+0.000
Nov 240.001+0.000
Nov 230.001+0.000
Nov 220.001+0.000
Nov 210.000-0.000
Nov 200.001-0.000
Nov 190.001-0.000
Nov 180.001-0.000
Nov 170.002-0.000
Nov 160.002+0.000
Nov 150.002+0.000
Nov 140.002+0.000
Nov 130.002+0.000
Nov 120.001+0.000
Nov 110.001-0.000
Nov 100.001-0.000
Nov 90.001+0.000
Nov 80.001+0.001
Nov 70.000-0.000
Nov 60.001-0.000
Nov 50.001-0.000
Nov 40.001+0.000
Nov 30.001-0.000
Nov 20.001+0.000
Nov 10.001+0.000
Oct 310.000-0.000
Oct 300.001-0.000
Oct 290.001+0.000
Oct 280.001—
81 more days on file for this meter, back to August 8, 2026. Full meter-level history is part of Institutional (API and downloads).
TranscoABBEVILLE-SCEG M7166 MP 1151.36

TranscoPlaced at the center of Anderson, SC — approximate; the exact meter site is not published.

Recent notices on Transco

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transco notices →

Transco · posted 2026-11-06 · effective 2026-11-10 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ABBEVILLE-SCEG M7166 MP 1151.36 (Transco loc 1003399) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/transco/1003399/