Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

NPPD/TPC NPPD BEATRICE POWER STA. G

Trailblazer Pipeline (TPC) · Loc 41056
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.002
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.011
Bcf/d
30-day average
0.011
30 of 30 days posted
30-day high
0.020
Nov 25
30-day low
0.000
Nov 21
Operating capacity
0.112
Bcf/d as posted, evening cycle
Utilization
1%
headroom 99%

Scheduled quantities as posted by Trailblazer Pipeline (TPC) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0050.0100.0150.020Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.002+0.000
Nov 260.002-0.018
Nov 250.020+0.000
Nov 240.020+0.001
Nov 230.019+0.005
Nov 220.014+0.014
Nov 210.000-0.003
Nov 200.003-0.005
Nov 190.008+0.005
Nov 180.003+0.003
Nov 170.000-0.003
Nov 160.003-0.016
Nov 150.019+0.015
Nov 140.004-0.007
Nov 130.010-0.010
Nov 120.020+0.005
Nov 110.015+0.005
Nov 100.010-0.005
Nov 90.015+0.003
Nov 80.012-0.007
Nov 70.019-0.001
Nov 60.020+0.000
Nov 50.020+0.001
Nov 40.019+0.017
Nov 30.003+0.003
Nov 20.000-0.001
Nov 10.001-0.017
Oct 310.018-0.001
Oct 300.019-0.001
Oct 290.020—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
NPPD/TPC NPPD BEATRICE POWER STA. G

Plant location from EIA Form 860 (plant 8000).

Recent notices on Trailblazer Pipeline (TPC)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.

SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NPPD/TPC NPPD BEATRICE POWER STA. G (Trailblazer Pipeline (TPC) loc 41056) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/trailblazer-pipeline-tpc/41056/