Gas day Nov 26
0.005
Bcf/d scheduled
Δ Day-over-day
+0.001
vs Nov 25
7-day average
0.003
Bcf/d
30-day average
0.003
30 of 30 days posted
30-day high
0.005
Nov 26
30-day low
0.000
Oct 29
Operating capacity
0.013
Bcf/d as posted, evening cycle
Utilization
39%
headroom 61%

Scheduled quantities as posted by Trailblazer Pipeline (TPC) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0020.0040.006Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.005+0.001
Nov 250.004+0.000
Nov 240.004+0.002
Nov 230.002+0.000
Nov 220.002+0.000
Nov 210.002-0.002
Nov 200.004+0.000
Nov 190.004+0.000
Nov 180.004+0.000
Nov 170.004+0.000
Nov 160.004+0.000
Nov 150.004+0.000
Nov 140.004+0.003
Nov 130.001+0.000
Nov 120.001+0.000
Nov 110.001+0.000
Nov 100.001-0.003
Nov 90.004+0.000
Nov 80.004+0.000
Nov 70.004+0.000
Nov 60.004+0.000
Nov 50.004+0.000
Nov 40.004+0.000
Nov 30.004+0.000
Nov 20.004+0.000
Nov 10.004+0.004
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000+0.000
Oct 280.000—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
NWC/TPC KEARNEY

Placed at the center of Kearney, NE — approximate; the exact meter site is not published.

Recent notices on Trailblazer Pipeline (TPC)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.

SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NWC/TPC KEARNEY (Trailblazer Pipeline (TPC) loc 25163) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/trailblazer-pipeline-tpc/25163/