Enercast — at the moment it matters
Home / Daily Summary / Canada Imports / Meter

TGP Niagara (TRANSCAN UDP, delivery to TransCanada)

Tennessee Gas Pipeline (TGP) · Loc 421079 · Northeast
Canada border crossing · counted in Canada Imports
Gas day Nov 27
-0.546
Bcf/d scheduled
Δ Day-over-day
+0.013
vs Nov 26
7-day average
-0.552
Bcf/d
30-day average
-0.553
30 of 30 days posted
30-day high
-0.486
Nov 3
30-day low
-0.588
Oct 31
Operating capacity
0.748
Bcf/d as posted, evening cycle
Utilization
73%
headroom 27%

Scheduled quantities as posted by Tennessee Gas Pipeline (TGP) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Canada Imports page.

-0.60-0.40-0.20-0.00Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27-0.546+0.013
Nov 26-0.559+0.012
Nov 25-0.570-0.015
Nov 24-0.556+0.022
Nov 23-0.577-0.048
Nov 22-0.530-0.006
Nov 21-0.524+0.024
Nov 20-0.548+0.031
Nov 19-0.579-0.055
Nov 18-0.525+0.024
Nov 17-0.549+0.021
Nov 16-0.569+0.003
Nov 15-0.573-0.000
Nov 14-0.572+0.008
Nov 13-0.580-0.011
Nov 12-0.570-0.010
Nov 11-0.560-0.015
Nov 10-0.544+0.000
Nov 9-0.545+0.000
Nov 8-0.545+0.000
Nov 7-0.545-0.000
Nov 6-0.544-0.000
Nov 5-0.544-0.030
Nov 4-0.514-0.028
Nov 3-0.486+0.070
Nov 2-0.555-0.015
Nov 1-0.540+0.048
Oct 31-0.588-0.001
Oct 30-0.587-0.008
Oct 29-0.579—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Tennessee Gas Pipeline

Tennessee Gas PipelineExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Tennessee Gas Pipeline (TGP)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Tennessee Gas Pipeline (TGP) notices →

Tennessee Gas Pipeline (TGP) · posted 2026-11-21 · effective 2026-11-16 · informational
Tennessee Gas Pipeline (TGP) · posted 2026-11-16 · effective 2026-11-16 · force majeure
TGP force majeure at Station 542 Unit 2A near De Kalb, MS remains in effect with no restoration timeline. Up to 250,000 Dth/d (0.25 Bcf/d) of Primary firm capacity pathed through Segment 539 BH is at risk of curtailment beginning Timely Cycle for gas day November 17. This Revisio…
Tennessee Gas Pipeline (TGP) · posted 2026-11-05 · effective 2026-11-06 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, TGP Niagara (TRANSCAN UDP, delivery to TransCanada) (Tennessee Gas Pipeline (TGP) loc 421079) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgp/421079/