Enercast — at the moment it matters
Home / Daily Summary / LNG Feedgas / Meter

Freeport -- TETCO into BIG (Brazoria Interconnector)

Texas Eastern Transmission (TETCO) · Loc 73912 · Gulf Coast
LNG feed-gas delivery · counted in LNG Feedgas
Gas day Nov 26
0.217
Bcf/d scheduled
Δ Day-over-day
+0.035
vs Nov 25
7-day average
0.185
Bcf/d
30-day average
0.164
30 of 30 days posted
30-day high
0.217
Nov 26
30-day low
0.025
Nov 2
Operating capacity
0.620
Bcf/d as posted, late_0005 cycle
Utilization
35%
headroom 65%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LNG Feedgas page.

0.000.100.200.30Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.217+0.035
Nov 250.183-0.005
Nov 240.188+0.010
Nov 230.178+0.000
Nov 220.178+0.000
Nov 210.178+0.000
Nov 200.178+0.000
Nov 190.177-0.005
Nov 180.183-0.015
Nov 170.198+0.010
Nov 160.188+0.000
Nov 150.188+0.000
Nov 140.188+0.000
Nov 130.188-0.017
Nov 120.205+0.002
Nov 110.203-0.004
Nov 100.206+0.009
Nov 90.198-0.007
Nov 80.204+0.007
Nov 70.198+0.038
Nov 60.159-0.015
Nov 50.174+0.082
Nov 40.093-0.028
Nov 30.120+0.095
Nov 20.025-0.003
Nov 10.029-0.101
Oct 310.130+0.009
Oct 300.121-0.013
Oct 290.134+0.032
Oct 280.102—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)Freeport -- TETCO into BIG (Brazoria Interconnector)

Texas Eastern (TETCO)Placed at the Freeport LNG terminal; approximate. The meter itself sits on the feed-gas line into the terminal.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Freeport -- TETCO into BIG (Brazoria Interconnector) (Texas Eastern Transmission (TETCO) loc 73912) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tetco/73912/