Lost River (withdrawal, Columbia Gas Transmission (TCO))

Columbia Gas Transmission (TCO) · Loc LOSTRI · Northeast
Storage injection / withdrawal · counted in Storage (also Storage)
Gas day Nov 27
+0.013
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
+0.016
Bcf/d
30-day average
+0.017
30 of 30 days posted
30-day high
+0.085
Nov 16
30-day low
+0.000
Nov 23
Operating capacity
0.230
Bcf/d as posted, timely cycle
Utilization
6%
headroom 94%

Scheduled quantities as posted by Columbia Gas Transmission (TCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.013+0.000
Nov 26+0.013+0.001
Nov 25+0.012-0.061
Nov 24+0.073+0.073
Nov 23+0.000+0.000
Nov 22+0.000+0.000
Nov 21+0.000-0.008
Nov 20+0.008+0.000
Nov 19+0.008-0.003
Nov 18+0.010-0.071
Nov 17+0.082-0.003
Nov 16+0.085+0.000
Nov 15+0.085+0.000
Nov 14+0.085+0.069
Nov 13+0.015+0.011
Nov 12+0.004+0.000
Nov 11+0.004+0.004
Nov 10+0.000+0.000
Nov 9+0.000+0.000
Nov 8+0.000+0.000
Nov 7+0.000+0.000
Nov 6+0.000+0.000
Nov 5+0.000+0.000
Nov 4+0.000+0.000
Nov 3+0.000+0.000
Nov 2+0.000+0.000
Nov 1+0.000+0.000
Oct 31+0.000+0.000
Oct 30+0.000+0.000
Oct 29+0.000—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Columbia Gas Transmission (TCO)

Columbia Gas Transmission (TCO)Exact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Columbia Gas Transmission (TCO) · posted 2026-10-30 · effective 2026-11-01 · informational
Columbia Gas Transmission (TCO) · posted 2026-10-30 · effective 2026-11-01 · informational
Columbia Gas Transmission (TCO) · posted 2026-10-29 · effective 2026-10-30 · informational
Recent notices on Columbia Gas Transmission (TCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Columbia Gas Transmission (TCO) notices →

Columbia Gas Transmission (TCO) · posted 2026-11-05 · force majeure
DTM Stonewall Gas Gathering has revised its Force Majeure at the TCO West Braxton delivery meter (842867) upward from 0.550 Bcf/d to 0.900 Bcf/d effective the Evening cycle of 11/05/2026, still with no restoration timeline to full normal capacity. The original FM was declared 9/2…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Lost River (withdrawal, Columbia Gas Transmission (TCO)) (Columbia Gas Transmission (TCO) loc LOSTRI) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tco/lostri/