Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

TMID/TIGT CASPER PVR NATRONA

Tallgrass Interstate Gas Transmission (TIGT) · Loc 36394 · Wyoming
Processing plant · counted in Supply / Production
Gas day Nov 26
-0.003
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
-0.004
Bcf/d
30-day average
-0.004
30 of 30 days posted
30-day high
-0.003
Nov 26
30-day low
-0.004
Nov 19
Operating capacity
0.003
Bcf/d as posted, evening cycle
Utilization
100%
headroom 0%

Scheduled quantities as posted by Tallgrass Interstate Gas Transmission (TIGT) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.006-0.004-0.0020.000Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 26-0.003+0.000
Nov 25-0.003+0.001
Nov 24-0.004+0.000
Nov 23-0.004+0.000
Nov 22-0.004+0.000
Nov 21-0.004+0.000
Nov 20-0.004+0.000
Nov 19-0.004-0.000
Nov 18-0.004+0.000
Nov 17-0.004+0.000
Nov 16-0.004+0.000
Nov 15-0.004+0.000
Nov 14-0.004+0.000
Nov 13-0.004+0.000
Nov 12-0.004+0.000
Nov 11-0.004-0.000
Nov 10-0.004+0.000
Nov 9-0.004+0.000
Nov 8-0.004+0.000
Nov 7-0.004+0.000
Nov 6-0.004+0.000
Nov 5-0.004+0.000
Nov 4-0.004+0.000
Nov 3-0.004+0.000
Nov 2-0.004+0.000
Nov 1-0.004-0.000
Oct 31-0.004+0.000
Oct 30-0.004+0.000
Oct 29-0.004+0.000
Oct 28-0.004—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).

State only (Wyoming) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Tallgrass Interstate Gas Transmission (TIGT)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.

SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, TMID/TIGT CASPER PVR NATRONA (Tallgrass Interstate Gas Transmission (TIGT) loc 36394) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tallgrass-interstate-gas-transmission-ti/36394/