Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

PEN/SNG LIVEOAK SUWANNEE

Southern Natural Gas · Loc 600260 · Florida
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
-0.001
Bcf/d scheduled
Δ Day-over-day
+0.001
vs Nov 25
7-day average
-0.001
Bcf/d
30-day average
-0.001
30 of 30 days posted
30-day high
-0.000
Oct 31
30-day low
-0.001
Nov 18
Operating capacity
0.009
Bcf/d as posted, evening cycle
Utilization
6%
headroom 94%

Scheduled quantities as posted by Southern Natural Gas on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.002-0.001-0.0010.000Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 26-0.001+0.001
Nov 25-0.001+0.000
Nov 24-0.001+0.000
Nov 23-0.001+0.000
Nov 22-0.001+0.000
Nov 21-0.001+0.000
Nov 20-0.001+0.000
Nov 19-0.001+0.000
Nov 18-0.001+0.000
Nov 17-0.001+0.000
Nov 16-0.001+0.000
Nov 15-0.001+0.000
Nov 14-0.001+0.000
Nov 13-0.001+0.000
Nov 12-0.001+0.000
Nov 11-0.001+0.000
Nov 10-0.001+0.000
Nov 9-0.001+0.000
Nov 8-0.001+0.000
Nov 7-0.001+0.000
Nov 6-0.001+0.000
Nov 5-0.001+0.000
Nov 4-0.001+0.000
Nov 3-0.001+0.000
Nov 2-0.001+0.000
Nov 1-0.001-0.001
Oct 31-0.000+0.000
Oct 30-0.000+0.000
Oct 29-0.000+0.000
Oct 28-0.000—
69 more days on file for this meter, back to August 20, 2026. Full meter-level history is part of Institutional (API and downloads).
Southern Natural Gas

Southern Natural GasState only (Florida) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Southern Natural Gas

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Southern Natural Gas notices →

Southern Natural Gas · posted 2026-11-23 · effective 2026-11-23 · informational
Southern Natural Gas · posted 2026-11-23 · effective 2026-11-22 · force majeure
Southern Natural Gas declared force majeure effective gas day November 22, 2026 due to an unscheduled pipeline outage on the South Main Loop Line east of the York compressor station (Segment 440, Zone 1/2 S Boundary) in Sumter County, AL. Capacity on Segment 440 is reduced by 500…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, PEN/SNG LIVEOAK SUWANNEE (Southern Natural Gas loc 600260) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/sng/600260/