Gas day Nov 27
0.002
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.001
Bcf/d
30-day average
0.001
30 of 30 days posted
30-day high
0.002
Nov 14
30-day low
0.001
Nov 1
Operating capacity
0.008
Bcf/d as posted, evening cycle
Utilization
23%
headroom 77%
Scheduled quantities as posted by Southern Natural Gas on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.002 | +0.000 |
| Nov 26 | 0.002 | +0.000 |
| Nov 25 | 0.001 | +0.000 |
| Nov 24 | 0.001 | +0.000 |
| Nov 23 | 0.001 | +0.000 |
| Nov 22 | 0.001 | +0.000 |
| Nov 21 | 0.001 | +0.000 |
| Nov 20 | 0.001 | -0.000 |
| Nov 19 | 0.001 | -0.000 |
| Nov 18 | 0.001 | -0.000 |
| Nov 17 | 0.002 | +0.000 |
| Nov 16 | 0.002 | -0.000 |
| Nov 15 | 0.002 | -0.000 |
| Nov 14 | 0.002 | +0.000 |
| Nov 13 | 0.002 | +0.000 |
| Nov 12 | 0.002 | +0.000 |
| Nov 11 | 0.001 | +0.000 |
| Nov 10 | 0.001 | +0.000 |
| Nov 9 | 0.001 | +0.000 |
| Nov 8 | 0.001 | +0.000 |
| Nov 7 | 0.001 | +0.000 |
| Nov 6 | 0.001 | +0.000 |
| Nov 5 | 0.001 | +0.000 |
| Nov 4 | 0.001 | +0.000 |
| Nov 3 | 0.001 | +0.000 |
| Nov 2 | 0.001 | +0.000 |
| Nov 1 | 0.001 | +0.000 |
| Oct 31 | 0.001 | -0.000 |
| Oct 30 | 0.001 | -0.000 |
| Oct 29 | 0.001 | — |
70 more days on file for this meter, back to August 20, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Southern Natural GasPlaced at the center of Thomas, GA — approximate; the exact meter site is not published.
Notices
Recent notices on Southern Natural Gas
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Southern Natural Gas notices →
Southern Natural Gas · posted 2026-11-23 · effective 2026-11-23 · informational
Southern Natural Gas · posted 2026-11-23 · effective 2026-11-22 · force majeure
Southern Natural Gas declared force majeure effective gas day November 22, 2026 due to an unscheduled pipeline outage on the South Main Loop Line east of the York compressor station (Segment 440, Zone 1/2 S Boundary) in Sumter County, AL. Capacity on Segment 440 is reduced by 500…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other LDC Citygate meters on Southern Natural Gas
- SPIREAL/SNG BESSEMER CALERA NORTH A 0.052 Bcf/d
- FGT/SNG JACKSONVILLE CLAY 0.040 Bcf/d
- DALTON/SNG DALTON AREA WHITFIELD 0.028 Bcf/d
- AUSTELL/SNG AUSTELL #1 DOUGLAS 0.028 Bcf/d
- PEOPLES/SNG TRUMBOWER NASSAU 0.028 Bcf/d
- PEOPLES/SNG JACKSONVILLE NASSAU 0.020 Bcf/d
- PEOPLES/SNG NORMANDY DUVALL 0.019 Bcf/d
- MARSHALL/SNG MARSHALL COUNTY #2 JEF 0.019 Bcf/d
Cite thisEnercast PipeScrape, THMASVIL/SNG AREA THOMAS (Southern Natural Gas loc 50690) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/sng/50690/