Enercast — at the moment it matters
Home / Daily Summary / Storage / Meter

Gemstone Canyon (Spire Storage West)

Ruby Pipeline · Loc 801215 · Rockies
Storage injection / withdrawal · counted in Storage (also Storage)
Gas day Nov 27
+0.014
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
+0.028
Bcf/d
30-day average
+0.014
30 of 30 days posted
30-day high
+0.059
Oct 30
30-day low
+0.000
Nov 18
Operating capacity
0.431
Bcf/d as posted, evening cycle
Utilization
3%
headroom 97%

Scheduled quantities as posted by Ruby Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.0000.0200.0400.060Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.014+0.000
Nov 26+0.014-0.031
Nov 25+0.044+0.000
Nov 24+0.044+0.009
Nov 23+0.035+0.013
Nov 22+0.022+0.000
Nov 21+0.022+0.000
Nov 20+0.022-0.015
Nov 19+0.037+0.037
Nov 18+0.000+0.000
Nov 17+0.000+0.000
Nov 16+0.000+0.000
Nov 15+0.000+0.000
Nov 14+0.000+0.000
Nov 13+0.000+0.000
Nov 12+0.000+0.000
Nov 11+0.000+0.000
Nov 10+0.000+0.000
Nov 9+0.000+0.000
Nov 8+0.000+0.000
Nov 7+0.000+0.000
Nov 6+0.000+0.000
Nov 5+0.000+0.000
Nov 4+0.000+0.000
Nov 3+0.000+0.000
Nov 2+0.000+0.000
Nov 1+0.000-0.055
Oct 31+0.055-0.004
Oct 30+0.059+0.007
Oct 29+0.052—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).

This meter is not geocoded yet, so no map is shown.

Recent notices on Ruby Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.

SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Gemstone Canyon (Spire Storage West) (Ruby Pipeline loc 801215) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ruby-pipeline/801215/