Gas day Nov 27
+0.014
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
+0.028
Bcf/d
30-day average
+0.014
30 of 30 days posted
30-day high
+0.059
Oct 30
30-day low
+0.000
Nov 18
Operating capacity
0.431
Bcf/d as posted, evening cycle
Utilization
3%
headroom 97%
Scheduled quantities as posted by Ruby Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | +0.014 | +0.000 |
| Nov 26 | +0.014 | -0.031 |
| Nov 25 | +0.044 | +0.000 |
| Nov 24 | +0.044 | +0.009 |
| Nov 23 | +0.035 | +0.013 |
| Nov 22 | +0.022 | +0.000 |
| Nov 21 | +0.022 | +0.000 |
| Nov 20 | +0.022 | -0.015 |
| Nov 19 | +0.037 | +0.037 |
| Nov 18 | +0.000 | +0.000 |
| Nov 17 | +0.000 | +0.000 |
| Nov 16 | +0.000 | +0.000 |
| Nov 15 | +0.000 | +0.000 |
| Nov 14 | +0.000 | +0.000 |
| Nov 13 | +0.000 | +0.000 |
| Nov 12 | +0.000 | +0.000 |
| Nov 11 | +0.000 | +0.000 |
| Nov 10 | +0.000 | +0.000 |
| Nov 9 | +0.000 | +0.000 |
| Nov 8 | +0.000 | +0.000 |
| Nov 7 | +0.000 | +0.000 |
| Nov 6 | +0.000 | +0.000 |
| Nov 5 | +0.000 | +0.000 |
| Nov 4 | +0.000 | +0.000 |
| Nov 3 | +0.000 | +0.000 |
| Nov 2 | +0.000 | +0.000 |
| Nov 1 | +0.000 | -0.055 |
| Oct 31 | +0.055 | -0.004 |
| Oct 30 | +0.059 | +0.007 |
| Oct 29 | +0.052 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
This meter is not geocoded yet, so no map is shown.
Notices
Recent notices on Ruby Pipeline
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.
SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Cite thisEnercast PipeScrape, Gemstone Canyon (Spire Storage West) (Ruby Pipeline loc 801215) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/ruby-pipeline/801215/