Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

NEVENER/RUBY (GPN) GOLD PAN DELIVER

Ruby Pipeline · Loc 800842 · ELKO, Nevada
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.009
Bcf/d scheduled
Δ Day-over-day
-0.000
vs Nov 25
7-day average
0.009
Bcf/d
30-day average
0.008
30 of 30 days posted
30-day high
0.015
Nov 19
30-day low
0.006
Nov 5
Operating capacity
0.043
Bcf/d as posted, evening cycle
Utilization
20%
headroom 80%

Scheduled quantities as posted by Ruby Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0050.0100.0150.020Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.009-0.000
Nov 250.009-0.002
Nov 240.011+0.001
Nov 230.009+0.001
Nov 220.009+0.000
Nov 210.009-0.000
Nov 200.009-0.006
Nov 190.015+0.007
Nov 180.008+0.001
Nov 170.007-0.003
Nov 160.010+0.004
Nov 150.006-0.001
Nov 140.007+0.000
Nov 130.007-0.001
Nov 120.008-0.001
Nov 110.009+0.002
Nov 100.007-0.001
Nov 90.008-0.001
Nov 80.009+0.001
Nov 70.008+0.000
Nov 60.008+0.002
Nov 50.006-0.001
Nov 40.007+0.001
Nov 30.006-0.002
Nov 20.008+0.000
Nov 10.008+0.000
Oct 310.008+0.000
Oct 300.008-0.001
Oct 290.009+0.002
Oct 280.007—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
NEVENER/RUBY (GPN) GOLD PAN DELIVER

Placed at the center of Elko, NV — approximate; the exact meter site is not published.

Recent notices on Ruby Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.

SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NEVENER/RUBY (GPN) GOLD PAN DELIVER (Ruby Pipeline loc 800842) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ruby-pipeline/800842/