Gas day Nov 26
0.009
Bcf/d scheduled
Δ Day-over-day
-0.000
vs Nov 25
7-day average
0.009
Bcf/d
30-day average
0.008
30 of 30 days posted
30-day high
0.015
Nov 19
30-day low
0.006
Nov 5
Operating capacity
0.043
Bcf/d as posted, evening cycle
Utilization
20%
headroom 80%
Scheduled quantities as posted by Ruby Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.009 | -0.000 |
| Nov 25 | 0.009 | -0.002 |
| Nov 24 | 0.011 | +0.001 |
| Nov 23 | 0.009 | +0.001 |
| Nov 22 | 0.009 | +0.000 |
| Nov 21 | 0.009 | -0.000 |
| Nov 20 | 0.009 | -0.006 |
| Nov 19 | 0.015 | +0.007 |
| Nov 18 | 0.008 | +0.001 |
| Nov 17 | 0.007 | -0.003 |
| Nov 16 | 0.010 | +0.004 |
| Nov 15 | 0.006 | -0.001 |
| Nov 14 | 0.007 | +0.000 |
| Nov 13 | 0.007 | -0.001 |
| Nov 12 | 0.008 | -0.001 |
| Nov 11 | 0.009 | +0.002 |
| Nov 10 | 0.007 | -0.001 |
| Nov 9 | 0.008 | -0.001 |
| Nov 8 | 0.009 | +0.001 |
| Nov 7 | 0.008 | +0.000 |
| Nov 6 | 0.008 | +0.002 |
| Nov 5 | 0.006 | -0.001 |
| Nov 4 | 0.007 | +0.001 |
| Nov 3 | 0.006 | -0.002 |
| Nov 2 | 0.008 | +0.000 |
| Nov 1 | 0.008 | +0.000 |
| Oct 31 | 0.008 | +0.000 |
| Oct 30 | 0.008 | -0.001 |
| Oct 29 | 0.009 | +0.002 |
| Oct 28 | 0.007 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Placed at the center of Elko, NV — approximate; the exact meter site is not published.
Notices
Recent notices on Ruby Pipeline
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.
SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…