Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

VECTREN NORTH/REX EAGLE VALLEY MORGAN

Rockies Express · Loc 60157
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.079
Bcf/d scheduled
Δ Day-over-day
-0.011
vs Nov 26
7-day average
0.085
Bcf/d
30-day average
0.085
30 of 30 days posted
30-day high
0.091
Oct 31
30-day low
0.077
Nov 21
Operating capacity
0.160
Bcf/d as posted, evening cycle
Utilization
49%
headroom 51%

Scheduled quantities as posted by Rockies Express on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.079-0.011
Nov 260.090+0.003
Nov 250.087-0.004
Nov 240.091+0.010
Nov 230.081-0.008
Nov 220.088+0.011
Nov 210.077-0.008
Nov 200.085-0.002
Nov 190.087+0.003
Nov 180.084-0.004
Nov 170.088+0.002
Nov 160.087-0.002
Nov 150.088+0.002
Nov 140.087-0.001
Nov 130.088-0.003
Nov 120.091+0.004
Nov 110.087+0.004
Nov 100.083-0.001
Nov 90.084-0.001
Nov 80.085+0.002
Nov 70.083-0.001
Nov 60.084+0.002
Nov 50.082+0.001
Nov 40.082-0.001
Nov 30.083+0.003
Nov 20.080-0.008
Nov 10.088-0.003
Oct 310.091+0.006
Oct 300.086+0.007
Oct 290.079—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Rockies ExpressVECTREN NORTH/REX EAGLE VALLEY MORGAN

Rockies ExpressPlant location from EIA Form 860 (plant 991).

Recent notices on Rockies Express

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Rockies Express notices →

Rockies Express · posted 2026-11-16 · effective 2026-11-16 · informational
Rockies Express · posted 2026-10-30 · effective 2026-10-30 · compressor issue
REX Update #19 continues the Bertrand Compressor Station operational issue on Segment 250, raising the West-to-East capacity cap marginally to 1.133 Bcf/d (from 1.094 Bcf/d in Update #18), effective Timely cycle Gas Day November 1, 2026, until further notice. Primary firm, second…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, VECTREN NORTH/REX EAGLE VALLEY MORGAN (Rockies Express loc 60157) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/rex/60157/