Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

AK STEEL/REX WARREN

Rockies Express · Loc 44497 · WARREN, Ohio
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 27
0.060
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.067
Bcf/d
30-day average
0.069
30 of 30 days posted
30-day high
0.083
Nov 16
30-day low
0.055
Oct 29
Operating capacity
0.100
Bcf/d as posted, evening cycle
Utilization
60%
headroom 40%

Scheduled quantities as posted by Rockies Express on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.060+0.000
Nov 260.060+0.000
Nov 250.060+0.000
Nov 240.060-0.017
Nov 230.077+0.000
Nov 220.077+0.000
Nov 210.077+0.007
Nov 200.070-0.010
Nov 190.080+0.010
Nov 180.070+0.000
Nov 170.070-0.013
Nov 160.083+0.000
Nov 150.083+0.000
Nov 140.083+0.023
Nov 130.060-0.018
Nov 120.077+0.000
Nov 110.077+0.018
Nov 100.060-0.005
Nov 90.065+0.000
Nov 80.065+0.000
Nov 70.065+0.005
Nov 60.060-0.002
Nov 50.062+0.002
Nov 40.060-0.006
Nov 30.066-0.012
Nov 20.078+0.000
Nov 10.078+0.008
Oct 310.070+0.000
Oct 300.070+0.015
Oct 290.055—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Rockies ExpressAK STEEL/REX WARREN

Rockies ExpressPlaced at the center of Warren, OH — approximate; the exact meter site is not published.

Recent notices on Rockies Express

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Rockies Express notices →

Rockies Express · posted 2026-11-16 · effective 2026-11-16 · informational
Rockies Express · posted 2026-10-30 · effective 2026-10-30 · compressor issue
REX Update #19 continues the Bertrand Compressor Station operational issue on Segment 250, raising the West-to-East capacity cap marginally to 1.133 Bcf/d (from 1.094 Bcf/d in Update #18), effective Timely cycle Gas Day November 1, 2026, until further notice. Primary firm, second…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, AK STEEL/REX WARREN (Rockies Express loc 44497) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/rex/44497/