Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

U.S. STEEL #1

Northern Natural Gas · Loc 2249 · ST LOUIS, Minnesota
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.020
Bcf/d
30-day average
0.034
30 of 30 days posted
30-day high
0.043
Nov 23
30-day low
0.000
Nov 27
Operating capacity
0.047
Bcf/d as posted, evening cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Northern Natural Gas on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0200.0400.060Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.000+0.000
Nov 260.000-0.012
Nov 250.012+0.012
Nov 240.000-0.043
Nov 230.043+0.000
Nov 220.043+0.000
Nov 210.043+0.000
Nov 200.043+0.000
Nov 190.043+0.000
Nov 180.043+0.000
Nov 170.043+0.008
Nov 160.034+0.000
Nov 150.034+0.000
Nov 140.034+0.012
Nov 130.022-0.020
Nov 120.043+0.000
Nov 110.043+0.000
Nov 100.043+0.000
Nov 90.043+0.000
Nov 80.043+0.000
Nov 70.043+0.012
Nov 60.031-0.012
Nov 50.043+0.000
Nov 40.043+0.000
Nov 30.043+0.000
Nov 20.043+0.000
Nov 10.043+0.009
Oct 310.034+0.000
Oct 300.034+0.000
Oct 290.034—
70 more days on file for this meter, back to August 20, 2026. Full meter-level history is part of Institutional (API and downloads).
U.S. STEEL #1

Placed at the center of St Louis, MN — approximate; the exact meter site is not published.

No recent notices matched or named this point, and no severity 3+ notices on Northern Natural Gas in the last 30 days.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, U.S. STEEL #1 (Northern Natural Gas loc 2249) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/northern-natural-gas/2249/