Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

APS YUCCA

North Baja Pipeline · Loc 953796
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.001
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.003
Bcf/d
30-day average
0.005
30 of 30 days posted
30-day high
0.010
Nov 9
30-day low
0.000
Nov 18
Operating capacity
0.083
Bcf/d as posted, timely cycle
Utilization
1%
headroom 99%

Scheduled quantities as posted by North Baja Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0030.0050.0070.010Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.001+0.000
Nov 260.001+0.000
Nov 250.001+0.000
Nov 240.001-0.004
Nov 230.005+0.000
Nov 220.005+0.000
Nov 210.005+0.000
Nov 200.005+0.000
Nov 190.005+0.005
Nov 180.000-0.005
Nov 170.005-0.003
Nov 160.008+0.000
Nov 150.008+0.000
Nov 140.008+0.000
Nov 130.008+0.000
Nov 120.008+0.000
Nov 110.008+0.000
Nov 100.008-0.002
Nov 90.010+0.000
Nov 80.010+0.000
Nov 70.010+0.000
Nov 60.010+0.000
Nov 50.010+0.000
Nov 40.010+0.000
Nov 30.010+0.009
Nov 20.001+0.000
Nov 10.001+0.000
Oct 310.001+0.000
Oct 300.001-0.001
Oct 290.002—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
North Baja PipelineAPS YUCCA

North Baja PipelinePlant location from EIA Form 860 (plant 120).

No recent notices matched or named this point, and no severity 3+ notices on North Baja Pipeline in the last 30 days. See all North Baja Pipeline notices.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, APS YUCCA (North Baja Pipeline loc 953796) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/northbaja/953796/