Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Vermillion - Duke

Midwestern Gas Transmission · Loc 283552
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.005
Bcf/d
30-day average
0.017
30 of 30 days posted
30-day high
0.052
Nov 3
30-day low
0.000
Nov 27
Operating capacity
0.373
Bcf/d as posted, evening cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Midwestern Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.060Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.000+0.000
Nov 260.000-0.005
Nov 250.005-0.014
Nov 240.019+0.005
Nov 230.014+0.014
Nov 220.000+0.000
Nov 210.000-0.007
Nov 200.007-0.010
Nov 190.017+0.009
Nov 180.008+0.005
Nov 170.003-0.001
Nov 160.004-0.009
Nov 150.013+0.000
Nov 140.013+0.003
Nov 130.010-0.006
Nov 120.016+0.002
Nov 110.014-0.001
Nov 100.015+0.004
Nov 90.011+0.004
Nov 80.007+0.003
Nov 70.004-0.015
Nov 60.019+0.014
Nov 50.005-0.035
Nov 40.040-0.012
Nov 30.052+0.002
Nov 20.050+0.007
Nov 10.043+0.012
Oct 310.031-0.014
Oct 300.045+0.007
Oct 290.038—
53 more days on file for this meter, back to September 6, 2026. Full meter-level history is part of Institutional (API and downloads).
Vermillion - Duke

Plant location from EIA Form 860 (plant 897).

No recent notices matched or named this point, and no severity 3+ notices on Midwestern Gas Transmission in the last 30 days.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Vermillion - Duke (Midwestern Gas Transmission loc 283552) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/midwestern-gas-transmission/283552/