Gas day Nov 27
-0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
-0.001
Bcf/d
30-day average
-0.012
30 of 30 days posted
30-day high
-0.000
Nov 27
30-day low
-0.032
Nov 12
Operating capacity
0.050
Bcf/d as posted, timely cycle
Utilization
0%
headroom 100%
Scheduled quantities as posted by KPC Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | -0.000 | +0.000 |
| Nov 26 | -0.000 | +0.000 |
| Nov 25 | -0.000 | +0.000 |
| Nov 24 | -0.000 | +0.010 |
| Nov 23 | -0.010 | -0.010 |
| Nov 22 | -0.000 | +0.000 |
| Nov 21 | -0.000 | +0.000 |
| Nov 20 | -0.000 | +0.000 |
| Nov 19 | -0.000 | +0.000 |
| Nov 18 | -0.000 | +0.010 |
| Nov 17 | -0.010 | -0.010 |
| Nov 16 | -0.000 | +0.000 |
| Nov 15 | -0.000 | +0.000 |
| Nov 14 | -0.000 | +0.000 |
| Nov 13 | -0.000 | +0.032 |
| Nov 12 | -0.032 | +0.000 |
| Nov 11 | -0.032 | +0.000 |
| Nov 10 | -0.032 | +0.000 |
| Nov 9 | -0.032 | +0.000 |
| Nov 8 | -0.032 | +0.000 |
| Nov 7 | -0.032 | +0.000 |
| Nov 6 | -0.032 | +0.000 |
| Nov 5 | -0.032 | -0.017 |
| Nov 4 | -0.015 | -0.015 |
| Nov 3 | -0.000 | +0.000 |
| Nov 2 | -0.000 | +0.000 |
| Nov 1 | -0.000 | +0.025 |
| Oct 31 | -0.025 | +0.000 |
| Oct 30 | -0.025 | +0.000 |
| Oct 29 | -0.025 | — |
54 more days on file for this meter, back to September 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
State only (Oklahoma) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
No recent notices matched or named this point, and no severity 3+ notices on KPC Pipeline in the last 30 days.
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on KPC Pipeline
- Cedar Creek (Atmos) -0.002 Bcf/d
Cite thisEnercast PipeScrape, Pawnee Delivery (KPC Pipeline loc 30226) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/kpc-pipeline/30226/