Enercast — at the moment it matters
Home / Daily Summary / LNG Feedgas / Meter

Sabine -- KMLP terminal delivery

Kinder Morgan Louisiana Pipeline · Loc 49448 · Gulf Coast
LNG feed-gas delivery · counted in LNG Feedgas
Gas day Nov 27
1.545
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
1.507
Bcf/d
30-day average
1.374
30 of 30 days posted
30-day high
1.545
Nov 27
30-day low
0.874
Nov 12
Operating capacity
1.700
Bcf/d as posted, evening cycle
Utilization
91%
headroom 9%

Scheduled quantities as posted by Kinder Morgan Louisiana Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LNG Feedgas page.

0.000.501.001.502.00Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 271.545+0.000
Nov 261.545+0.113
Nov 251.432-0.013
Nov 241.446-0.099
Nov 231.545+0.028
Nov 221.517+0.000
Nov 211.517+0.068
Nov 201.449+0.283
Nov 191.166-0.204
Nov 181.370+0.108
Nov 171.262-0.175
Nov 161.436-0.076
Nov 151.513-0.031
Nov 141.544+0.013
Nov 131.531+0.657
Nov 120.874-0.007
Nov 110.880-0.000
Nov 100.880-0.522
Nov 91.402-0.062
Nov 81.464+0.023
Nov 71.441+0.008
Nov 61.432+0.116
Nov 51.316-0.071
Nov 41.387+0.007
Nov 31.380+0.079
Nov 21.301-0.006
Nov 11.307-0.148
Oct 311.454+0.098
Oct 301.356-0.171
Oct 291.527—
76 more days on file for this meter, back to August 14, 2026. Full meter-level history is part of Institutional (API and downloads).
Sabine -- KMLP terminal delivery

Placed at the Sabine LNG terminal; approximate. The meter itself sits on the feed-gas line into the terminal.

Recent notices on Kinder Morgan Louisiana Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Kinder Morgan Louisiana Pipeline notices →

Kinder Morgan Louisiana Pipeline · posted 2026-11-10 · effective 2026-08-20 · maintenance
KMLP is performing maintenance at Compressor Station 760 in Acadia Parish, Louisiana, requiring a reduction in southbound throughput capacity through Segment 140 (MLV #7 - Jefferson Davis) for gas days November 10-12, 2026. Primary Firm and Secondary in-path Firm transports will …

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Sabine -- KMLP terminal delivery (Kinder Morgan Louisiana Pipeline loc 49448) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/kmlp/49448/