Gas day Nov 27
1.545
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
1.507
Bcf/d
30-day average
1.374
30 of 30 days posted
30-day high
1.545
Nov 27
30-day low
0.874
Nov 12
Operating capacity
1.700
Bcf/d as posted, evening cycle
Utilization
91%
headroom 9%
Scheduled quantities as posted by Kinder Morgan Louisiana Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LNG Feedgas page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 1.545 | +0.000 |
| Nov 26 | 1.545 | +0.113 |
| Nov 25 | 1.432 | -0.013 |
| Nov 24 | 1.446 | -0.099 |
| Nov 23 | 1.545 | +0.028 |
| Nov 22 | 1.517 | +0.000 |
| Nov 21 | 1.517 | +0.068 |
| Nov 20 | 1.449 | +0.283 |
| Nov 19 | 1.166 | -0.204 |
| Nov 18 | 1.370 | +0.108 |
| Nov 17 | 1.262 | -0.175 |
| Nov 16 | 1.436 | -0.076 |
| Nov 15 | 1.513 | -0.031 |
| Nov 14 | 1.544 | +0.013 |
| Nov 13 | 1.531 | +0.657 |
| Nov 12 | 0.874 | -0.007 |
| Nov 11 | 0.880 | -0.000 |
| Nov 10 | 0.880 | -0.522 |
| Nov 9 | 1.402 | -0.062 |
| Nov 8 | 1.464 | +0.023 |
| Nov 7 | 1.441 | +0.008 |
| Nov 6 | 1.432 | +0.116 |
| Nov 5 | 1.316 | -0.071 |
| Nov 4 | 1.387 | +0.007 |
| Nov 3 | 1.380 | +0.079 |
| Nov 2 | 1.301 | -0.006 |
| Nov 1 | 1.307 | -0.148 |
| Oct 31 | 1.454 | +0.098 |
| Oct 30 | 1.356 | -0.171 |
| Oct 29 | 1.527 | — |
76 more days on file for this meter, back to August 14, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Placed at the Sabine LNG terminal; approximate. The meter itself sits on the feed-gas line into the terminal.
Notices
Recent notices on Kinder Morgan Louisiana Pipeline
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Kinder Morgan Louisiana Pipeline notices →
Kinder Morgan Louisiana Pipeline · posted 2026-11-10 · effective 2026-08-20 · maintenance
KMLP is performing maintenance at Compressor Station 760 in Acadia Parish, Louisiana, requiring a reduction in southbound throughput capacity through Segment 140 (MLV #7 - Jefferson Davis) for gas days November 10-12, 2026. Primary Firm and Secondary in-path Firm transports will …
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Cite thisEnercast PipeScrape, Sabine -- KMLP terminal delivery (Kinder Morgan Louisiana Pipeline loc 49448) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/kmlp/49448/