TARGA/KMLP TFS CALCASIEU

Kinder Morgan Louisiana Pipeline · Loc 45093 · CALCASIEU, Louisiana
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.034
Bcf/d scheduled
Δ Day-over-day
-0.005
vs Nov 25
7-day average
0.030
Bcf/d
30-day average
0.028
30 of 30 days posted
30-day high
0.045
Nov 8
30-day low
0.003
Nov 10
Operating capacity
0.100
Bcf/d as posted, evening cycle
Utilization
34%
headroom 66%

Scheduled quantities as posted by Kinder Morgan Louisiana Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0200.0400.060Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.034-0.005
Nov 250.040+0.000
Nov 240.040+0.015
Nov 230.024-0.000
Nov 220.025+0.000
Nov 210.025+0.003
Nov 200.022-0.003
Nov 190.025+0.000
Nov 180.025-0.005
Nov 170.030+0.000
Nov 160.030+0.010
Nov 150.020+0.000
Nov 140.020+0.005
Nov 130.015+0.005
Nov 120.010+0.000
Nov 110.010+0.007
Nov 100.003-0.036
Nov 90.040-0.005
Nov 80.045+0.000
Nov 70.045+0.003
Nov 60.042+0.007
Nov 50.035-0.003
Nov 40.038+0.009
Nov 30.029-0.009
Nov 20.038+0.018
Nov 10.020-0.015
Oct 310.035+0.000
Oct 300.035+0.015
Oct 290.020+0.000
Oct 280.020—
75 more days on file for this meter, back to August 14, 2026. Full meter-level history is part of Institutional (API and downloads).
TARGA/KMLP TFS CALCASIEU

Placed at the center of Calcasieu, LA — approximate; the exact meter site is not published.

Recent notices on Kinder Morgan Louisiana Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Kinder Morgan Louisiana Pipeline notices →

Kinder Morgan Louisiana Pipeline · posted 2026-11-10 · effective 2026-08-20 · maintenance
KMLP is performing maintenance at Compressor Station 760 in Acadia Parish, Louisiana, requiring a reduction in southbound throughput capacity through Segment 140 (MLV #7 - Jefferson Davis) for gas days November 10-12, 2026. Primary Firm and Secondary in-path Firm transports will …

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, TARGA/KMLP TFS CALCASIEU (Kinder Morgan Louisiana Pipeline loc 45093) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/kmlp/45093/