Enercast — at the moment it matters
Home / Daily Summary / Storage / Meter

Egan Hub (via KMLP)

Kinder Morgan Louisiana Pipeline · Loc 44403 · Gulf Coast
Storage injection / withdrawal · counted in Storage (also Storage)
Gas day Nov 27
+0.025
Bcf/d scheduled
Δ Day-over-day
+0.010
vs Nov 26
7-day average
+0.036
Bcf/d
30-day average
+0.010
30 of 30 days posted
30-day high
+0.062
Nov 22
30-day low
+0.000
Nov 17
Operating capacity
0.780
Bcf/d as posted, evening cycle
Utilization
3%
headroom 97%

Scheduled quantities as posted by Kinder Morgan Louisiana Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.025+0.010
Nov 26+0.015-0.015
Nov 25+0.030+0.011
Nov 24+0.019-0.022
Nov 23+0.041-0.021
Nov 22+0.062+0.003
Nov 21+0.059+0.045
Nov 20+0.014-0.004
Nov 19+0.019+0.007
Nov 18+0.011+0.011
Nov 17+0.000+0.000
Nov 16+0.000+0.000
Nov 15+0.000+0.000
Nov 14+0.000+0.000
Nov 13+0.000+0.000
Nov 12+0.000+0.000
Nov 11+0.000+0.000
Nov 10+0.000+0.000
Nov 9+0.000+0.000
Nov 8+0.000+0.000
Nov 7+0.000+0.000
Nov 6+0.000+0.000
Nov 5+0.000+0.000
Nov 4+0.000+0.000
Nov 3+0.000+0.000
Nov 2+0.000+0.000
Nov 1+0.000+0.000
Oct 31+0.000+0.000
Oct 30+0.000+0.000
Oct 29+0.000—
76 more days on file for this meter, back to August 14, 2026. Full meter-level history is part of Institutional (API and downloads).

This meter is not geocoded yet, so no map is shown.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Kinder Morgan Louisiana Pipeline · posted 2026-11-10 · effective 2026-08-20 · maintenance
KMLP is performing maintenance at Compressor Station 760 in Acadia Parish, Louisiana, requiring a reduction in southbound throughput capacity through Segment 140 (MLV #7 - Jefferson Davis) for gas days November 10-12, 2026. Primary Firm and Secondary in-path Firm transports will …

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Egan Hub (via KMLP) (Kinder Morgan Louisiana Pipeline loc 44403) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/kmlp/44403/