Gas day Nov 26
1.483
Bcf/d scheduled
Δ Day-over-day
-0.015
vs Nov 25
7-day average
1.480
Bcf/d
30-day average
1.283
30 of 30 days posted
30-day high
1.498
Nov 25
30-day low
0.495
Nov 1
Operating capacity
1.779
Bcf/d as posted, eve cycle
Utilization
83%
headroom 17%
Scheduled quantities as posted by Gulf South Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LNG Feedgas page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 1.483 | -0.015 |
| Nov 25 | 1.498 | +0.010 |
| Nov 24 | 1.488 | +0.015 |
| Nov 23 | 1.473 | +0.000 |
| Nov 22 | 1.473 | +0.005 |
| Nov 21 | 1.468 | -0.004 |
| Nov 20 | 1.473 | -0.006 |
| Nov 19 | 1.479 | -0.009 |
| Nov 18 | 1.488 | +0.009 |
| Nov 17 | 1.479 | -0.017 |
| Nov 16 | 1.496 | -0.000 |
| Nov 15 | 1.496 | +0.001 |
| Nov 14 | 1.495 | +0.008 |
| Nov 13 | 1.486 | +0.000 |
| Nov 12 | 1.486 | +0.047 |
| Nov 11 | 1.439 | -0.029 |
| Nov 10 | 1.468 | -0.006 |
| Nov 9 | 1.474 | +0.000 |
| Nov 8 | 1.474 | +0.000 |
| Nov 7 | 1.474 | +0.198 |
| Nov 6 | 1.276 | +0.241 |
| Nov 5 | 1.034 | +0.037 |
| Nov 4 | 0.997 | +0.366 |
| Nov 3 | 0.631 | +0.061 |
| Nov 2 | 0.570 | +0.074 |
| Nov 1 | 0.495 | -0.516 |
| Oct 31 | 1.012 | +0.036 |
| Oct 30 | 0.976 | -0.006 |
| Oct 29 | 0.982 | +0.066 |
| Oct 28 | 0.916 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Gulf South PipelinePlaced at the Freeport LNG terminal; approximate. The meter itself sits on the feed-gas line into the terminal.
Notices
Matched to this meter
Enercast’s scorer tied these notices to this exact posted point.
Gulf South Pipeline · posted 2026-11-02 · effective 2026-11-01 · operational alert
Gulf South Pipeline has issued a Critical Over-Under Performance notice for Loc 24329 Stratton Ridge to Freeport LNG, effective Gas Day 11/2/2026 and until further notice, due to the customer's failure to take confirmed quantities. Gulf South will impose scheduling reductions on …
Gulf South Pipeline · posted 2026-10-27 · effective 2026-10-27 · operational alert
Gulf South Pipeline has extended its System Management Plan at Location 24329 Stratton Ridge (to Freeport LNG) for a second consecutive day, effective 10/27/2026 08:00 AM through 10/28/2026 09:00 AM. The SMP is triggered by Freeport LNG's continued failure to take confirmed quant…
Gulf South Pipeline · posted 2026-10-26 · effective 2026-10-26 · operational alert
Gulf South Pipeline has implemented a System Management Plan at Location SLN 024329 Stratton Ridge (to Freeport LNG) effective 08:30 AM on October 26, 2026, reducing scheduled quantities to 0 Dth/d until further notice through at least October 27 at 09:00 AM. The curtailment was …
Gulf South Pipeline · posted 2026-10-21 · effective 2026-10-21 · operational alert
Gulf South Pipeline has issued a second consecutive Over-Under Performance notice (new ID 5038899) for Loc 24329 Stratton Ridge to Freeport LNG, covering Gas Day 10/21/2026 and until further notice -- an exact reissuance of yesterday's notice (GSPL-5038892) shifted forward one ga…
Gulf South Pipeline · posted 2026-10-20 · effective 2026-10-20 · operational alert
Gulf South Pipeline issued a Critical Over-Under Performance notice on Gas Day 10/20/2026 for Loc 24329 (Stratton Ridge to Freeport LNG), citing a customer's failure to take confirmed quantities and triggering scheduling reductions for remaining nomination cycles through at least…
Gulf South Pipeline · posted 2026-10-17 · effective 2026-10-17 · operational alert
Gulf South Pipeline issued a Critical Over-Under Performance notice for Gas Day 10/17/2026, citing the customer's failure to take confirmed quantities at Loc 24329 Stratton Ridge to Freeport LNG. Gulf South is implementing scheduling reductions for remaining nomination cycles on …
Gulf South Pipeline · posted 2026-09-17 · effective 2026-09-17 · operational alert
Gulf South Pipeline issued a Critical Over-Under Performance notice on 2026-09-17 for Loc 24329 Stratton Ridge to Freeport LNG, citing the customer's failure to take confirmed delivery quantities. Gulf South is reducing scheduling for remaining nomination cycles for Gas Day 9/17/…
Recent notices on Gulf South Pipeline
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf South Pipeline notices →
Gulf South Pipeline · posted 2026-11-19 · effective 2026-11-20 · informational
Gulf South Pipeline · posted 2026-11-06 · effective 2026-11-06 · informational
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Cite thisEnercast PipeScrape, Freeport -- Gulf South Stratton Ridge leg (Gulf South Pipeline loc 24329) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfsouth/24329/