Gas day Nov 27
+0.011
Bcf/d scheduled
Δ Day-over-day
-0.022
vs Nov 26
7-day average
+0.029
Bcf/d
30-day average
+0.014
30 of 30 days posted
30-day high
+0.047
Nov 25
30-day low
+0.000
Nov 20
Operating capacity
0.500
Bcf/d as posted, none cycle
Utilization
2%
headroom 98%

Scheduled quantities as posted by Gulf Run Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

0.0000.0200.0400.060Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27+0.011-0.022
Nov 26+0.033-0.014
Nov 25+0.047+0.015
Nov 24+0.032+0.004
Nov 23+0.027+0.005
Nov 22+0.023-0.007
Nov 21+0.030+0.030
Nov 20+0.000+0.000
Nov 19+0.000-0.008
Nov 18+0.008+0.008
Nov 17+0.000-0.032
Nov 16+0.032+0.032
Nov 15+0.000+0.000
Nov 14+0.000-0.022
Nov 13+0.022+0.022
Nov 12+0.000+0.000
Nov 11+0.000-0.002
Nov 10+0.002-0.015
Nov 9+0.017-0.021
Nov 8+0.038-0.001
Nov 7+0.039+0.025
Nov 6+0.015+0.014
Nov 5+0.001-0.006
Nov 4+0.007+0.007
Nov 3+0.000+0.000
Nov 2+0.000-0.007
Nov 1+0.007+0.005
Oct 31+0.002-0.013
Oct 30+0.015+0.015
Oct 29+0.000—
78 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf Run Transmission

Gulf Run TransmissionExact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on Gulf Run Transmission

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf Run Transmission notices →

Gulf Run Transmission · posted 2026-11-25 · effective 2026-12-02 · force majeure
Gulf Run Transmission has declared force majeure for unplanned maintenance at its Vernon Compressor Station in Jackson Parish, Louisiana (Zone 1), effective December 2, 2026 at 9:00 a.m. and anticipated to complete by December 3, 2026 at 9:00 a.m. During this one-day window, thro…