Gas day Nov 27
+0.011
Bcf/d scheduled
Δ Day-over-day
-0.022
vs Nov 26
7-day average
+0.029
Bcf/d
30-day average
+0.014
30 of 30 days posted
30-day high
+0.047
Nov 25
30-day low
+0.000
Nov 20
Operating capacity
0.500
Bcf/d as posted, none cycle
Utilization
2%
headroom 98%
Scheduled quantities as posted by Gulf Run Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | +0.011 | -0.022 |
| Nov 26 | +0.033 | -0.014 |
| Nov 25 | +0.047 | +0.015 |
| Nov 24 | +0.032 | +0.004 |
| Nov 23 | +0.027 | +0.005 |
| Nov 22 | +0.023 | -0.007 |
| Nov 21 | +0.030 | +0.030 |
| Nov 20 | +0.000 | +0.000 |
| Nov 19 | +0.000 | -0.008 |
| Nov 18 | +0.008 | +0.008 |
| Nov 17 | +0.000 | -0.032 |
| Nov 16 | +0.032 | +0.032 |
| Nov 15 | +0.000 | +0.000 |
| Nov 14 | +0.000 | -0.022 |
| Nov 13 | +0.022 | +0.022 |
| Nov 12 | +0.000 | +0.000 |
| Nov 11 | +0.000 | -0.002 |
| Nov 10 | +0.002 | -0.015 |
| Nov 9 | +0.017 | -0.021 |
| Nov 8 | +0.038 | -0.001 |
| Nov 7 | +0.039 | +0.025 |
| Nov 6 | +0.015 | +0.014 |
| Nov 5 | +0.001 | -0.006 |
| Nov 4 | +0.007 | +0.007 |
| Nov 3 | +0.000 | +0.000 |
| Nov 2 | +0.000 | -0.007 |
| Nov 1 | +0.007 | +0.005 |
| Oct 31 | +0.002 | -0.013 |
| Oct 30 | +0.015 | +0.015 |
| Oct 29 | +0.000 | — |
78 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Gulf Run TransmissionExact site not geocoded — the highlighted line is the pipeline system this meter sits on.
Notices
Recent notices on Gulf Run Transmission
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf Run Transmission notices →
Gulf Run Transmission · posted 2026-11-25 · effective 2026-12-02 · force majeure
Gulf Run Transmission has declared force majeure for unplanned maintenance at its Vernon Compressor Station in Jackson Parish, Louisiana (Zone 1), effective December 2, 2026 at 9:00 a.m. and anticipated to complete by December 3, 2026 at 9:00 a.m. During this one-day window, thro…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Cite thisEnercast PipeScrape, Arcadia GR (Gulf Run Transmission loc 822090) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfrun/822090/