Gas day Nov 26
0.139
Bcf/d scheduled
Δ Day-over-day
+0.034
vs Nov 25
7-day average
0.102
Bcf/d
30-day average
0.121
30 of 30 days posted
30-day high
0.165
Oct 31
30-day low
0.000
Nov 17
Operating capacity
0.700
Bcf/d as posted, evening cycle
Utilization
20%
headroom 80%
Scheduled quantities as posted by Golden Pass Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.139 | +0.034 |
| Nov 25 | 0.105 | +0.076 |
| Nov 24 | 0.029 | -0.114 |
| Nov 23 | 0.144 | +0.050 |
| Nov 22 | 0.093 | +0.031 |
| Nov 21 | 0.062 | -0.082 |
| Nov 20 | 0.144 | +0.094 |
| Nov 19 | 0.050 | -0.019 |
| Nov 18 | 0.069 | +0.069 |
| Nov 17 | 0.000 | -0.043 |
| Nov 16 | 0.043 | -0.100 |
| Nov 15 | 0.144 | +0.000 |
| Nov 14 | 0.144 | +0.005 |
| Nov 13 | 0.139 | -0.005 |
| Nov 12 | 0.144 | +0.000 |
| Nov 11 | 0.144 | -0.020 |
| Nov 10 | 0.164 | +0.020 |
| Nov 9 | 0.144 | +0.000 |
| Nov 8 | 0.144 | +0.000 |
| Nov 7 | 0.144 | +0.025 |
| Nov 6 | 0.119 | -0.025 |
| Nov 5 | 0.144 | +0.005 |
| Nov 4 | 0.139 | +0.010 |
| Nov 3 | 0.129 | +0.010 |
| Nov 2 | 0.119 | +0.000 |
| Nov 1 | 0.119 | -0.046 |
| Oct 31 | 0.165 | +0.000 |
| Oct 30 | 0.165 | +0.000 |
| Oct 29 | 0.165 | +0.000 |
| Oct 28 | 0.165 | — |
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Golden Pass PipelineState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
Recent notices on Golden Pass Pipeline
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.
SEV 4/5Minimum Flow Design
Golden Pass Pipeline · posted 2026-10-31 · effective 2026-10-30 · operational alert
Golden Pass Pipeline LLC (Sabine Pass, TX to Starks, LA) posted a Critical notice on October 30, 2026 regarding a Minimum Flow Design requirement on its LNG export feed gas pipeline, which has capacity of up to 2.6 Bcf/d. The notice does not specify the magnitude of the minimum s…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Cite thisEnercast PipeScrape, MIDCOAST (Golden Pass Pipeline loc 805537) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/golden-pass-pipeline/805537/