Gas day Nov 26
0.040
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.035
Bcf/d
30-day average
0.037
30 of 30 days posted
30-day high
0.040
Nov 26
30-day low
0.008
Nov 20
Operating capacity
0.100
Bcf/d as posted, timely cycle
Utilization
40%
headroom 60%
Scheduled quantities as posted by ETC Tiger Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.040 | +0.000 |
| Nov 25 | 0.040 | +0.005 |
| Nov 24 | 0.035 | -0.005 |
| Nov 23 | 0.040 | +0.000 |
| Nov 22 | 0.040 | +0.000 |
| Nov 21 | 0.040 | +0.032 |
| Nov 20 | 0.008 | -0.032 |
| Nov 19 | 0.040 | +0.013 |
| Nov 18 | 0.027 | -0.013 |
| Nov 17 | 0.040 | +0.000 |
| Nov 16 | 0.040 | +0.000 |
| Nov 15 | 0.040 | +0.000 |
| Nov 14 | 0.040 | +0.009 |
| Nov 13 | 0.032 | -0.009 |
| Nov 12 | 0.040 | +0.000 |
| Nov 11 | 0.040 | +0.010 |
| Nov 10 | 0.030 | -0.010 |
| Nov 9 | 0.040 | +0.000 |
| Nov 8 | 0.040 | +0.000 |
| Nov 7 | 0.040 | +0.000 |
| Nov 6 | 0.040 | +0.000 |
| Nov 5 | 0.040 | +0.013 |
| Nov 4 | 0.027 | -0.013 |
| Nov 3 | 0.040 | +0.000 |
| Nov 2 | 0.040 | +0.000 |
| Nov 1 | 0.040 | +0.000 |
| Oct 31 | 0.040 | +0.000 |
| Oct 30 | 0.040 | +0.000 |
| Oct 29 | 0.040 | +0.000 |
| Oct 28 | 0.040 | — |
53 more days on file for this meter, back to September 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
State only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
No recent notices matched or named this point, and no severity 3+ notices on ETC Tiger Pipeline in the last 30 days.
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on ETC Tiger Pipeline
- CARTHAGE HUB 0.714 Bcf/d
- KINDERHAWK NORTH HOLLY I/C 0.308 Bcf/d
- KINDERHAWK PLANTATION I/C 0.300 Bcf/d
- BISTINEAU 0.288 Bcf/d
- SPRINGRIDGE 0.192 Bcf/d
- MAGNOLIA 0.155 Bcf/d
- EXCO / HOLLY 0.141 Bcf/d
- MANSFIELD 0.089 Bcf/d
Cite thisEnercast PipeScrape, Black Bear Caddo (ETC Tiger Pipeline loc 79037) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/etc-tiger-pipeline/79037/