Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

Black Bear Caddo

ETC Tiger Pipeline · Loc 79037 · Louisiana
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.040
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.035
Bcf/d
30-day average
0.037
30 of 30 days posted
30-day high
0.040
Nov 26
30-day low
0.008
Nov 20
Operating capacity
0.100
Bcf/d as posted, timely cycle
Utilization
40%
headroom 60%

Scheduled quantities as posted by ETC Tiger Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0100.0200.0300.040Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.040+0.000
Nov 250.040+0.005
Nov 240.035-0.005
Nov 230.040+0.000
Nov 220.040+0.000
Nov 210.040+0.032
Nov 200.008-0.032
Nov 190.040+0.013
Nov 180.027-0.013
Nov 170.040+0.000
Nov 160.040+0.000
Nov 150.040+0.000
Nov 140.040+0.009
Nov 130.032-0.009
Nov 120.040+0.000
Nov 110.040+0.010
Nov 100.030-0.010
Nov 90.040+0.000
Nov 80.040+0.000
Nov 70.040+0.000
Nov 60.040+0.000
Nov 50.040+0.013
Nov 40.027-0.013
Nov 30.040+0.000
Nov 20.040+0.000
Nov 10.040+0.000
Oct 310.040+0.000
Oct 300.040+0.000
Oct 290.040+0.000
Oct 280.040—
53 more days on file for this meter, back to September 5, 2026. Full meter-level history is part of Institutional (API and downloads).

State only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.

No recent notices matched or named this point, and no severity 3+ notices on ETC Tiger Pipeline in the last 30 days.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Black Bear Caddo (ETC Tiger Pipeline loc 79037) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/etc-tiger-pipeline/79037/