ETCSPM/EPNG (IBRCOBND) BRONCO BENED

El Paso Natural Gas (EPNG) · Loc 801185 · Texas
Gathering receipt · counted in Supply / Production
Gas day Nov 27
0.022
Bcf/d scheduled
Δ Day-over-day
-0.020
vs Nov 26
7-day average
0.022
Bcf/d
30-day average
0.015
30 of 30 days posted
30-day high
0.043
Nov 26
30-day low
0.000
Nov 17
Operating capacity
0.126
Bcf/d as posted, evening cycle
Utilization
18%
headroom 82%

Scheduled quantities as posted by El Paso Natural Gas (EPNG) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0200.0400.060Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.022-0.020
Nov 260.043+0.020
Nov 250.022+0.005
Nov 240.017+0.000
Nov 230.017+0.000
Nov 220.017+0.000
Nov 210.017-0.010
Nov 200.027+0.010
Nov 190.017+0.010
Nov 180.007+0.007
Nov 170.000-0.025
Nov 160.025+0.020
Nov 150.005-0.020
Nov 140.025+0.011
Nov 130.014-0.011
Nov 120.025+0.000
Nov 110.025+0.000
Nov 100.025+0.016
Nov 90.009+0.000
Nov 80.009+0.000
Nov 70.009+0.009
Nov 60.000-0.006
Nov 50.006+0.004
Nov 40.002-0.002
Nov 30.004-0.004
Nov 20.009-0.013
Nov 10.022+0.008
Oct 310.013+0.000
Oct 300.013+0.000
Oct 290.013—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
El Paso Natural Gas

El Paso Natural GasState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on El Paso Natural Gas (EPNG)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All El Paso Natural Gas (EPNG) notices →

El Paso Natural Gas (EPNG) · posted 2026-11-17 · effective 2026-11-17 · force majeure
EPNG has declared force majeure at Laguna Compressor Station in Cibola County, New Mexico following a compressor gasket leak. The station is unavailable while repairs are completed, reducing operational capacity through the CAPROCK N constraint by 77,194 Dth/d (0.077 Bcf/d) effec…
El Paso Natural Gas (EPNG) · posted 2026-11-17 · effective 2026-11-17 · informational
El Paso Natural Gas (EPNG) · posted 2026-11-04 · effective 2026-11-04 · informational
El Paso Natural Gas (EPNG) · posted 2026-11-03 · effective 2026-11-03 · force majeure
EPNG declared force majeure at Lincoln Compressor Station in Lincoln County, New Mexico due to a flame detection failure. This Update #1 escalates the capacity reduction through the CAPROCK N constraint from 214,491 Dth/d to 274,843 Dth/d (~0.275 Bcf/d), effective Intraday 1 Cycl…
El Paso Natural Gas (EPNG) · posted 2026-10-31 · effective 2026-10-31 · force majeure
EPNG has declared force majeure at its Roswell Compressor Station in Chaves County, New Mexico, following a turbo thrust bearing failure that has taken the station fully offline. Operational capacity through the CAPROCK N constraint will be reduced by 175,228 Dth/d (0.175 Bcf/d) …
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-29 · force majeure
EPNG Force Majeure Update #2 on Line No. 1600 (third-party line strike downstream of Waha Compressor Station, Reeves County TX) adds the WA CORN scheduling constraint to zero net capacity effective Intraday 1 Cycle (Cycle 3) on October 29, 2026, joining previously zeroed Imperial…
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-29 · force majeure
EPNG Update #1 on the Line 1600 third-party line strike downstream of Waha Compressor Station in Reeves County, TX: the repair now requires full pipeline replacement rather than a simple pressure restriction. Two additional point locations -- Imperial Receipt/Delivery (loc 58045)…
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-28 · force majeure
EPNG has declared force majeure on Line No. 1600 downstream of Waha Compressor Station in Reeves County, TX following a third-party line strike. The L1600EST constraint is initially capped at 0.250 Bcf/d effective Intraday 3 Cycle on October 28, dropping to zero effective the Eve…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.