Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

ET G&P/EPNG (IREDBLUF) RED BLUFF RE

El Paso Natural Gas (EPNG) · Loc 800911 · Texas
Processing plant · counted in Supply / Production
Gas day Nov 27
0.097
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.110
Bcf/d
30-day average
0.097
30 of 30 days posted
30-day high
0.150
Nov 21
30-day low
0.040
Oct 31
Operating capacity
0.204
Bcf/d as posted, evening cycle
Utilization
47%
headroom 53%

Scheduled quantities as posted by El Paso Natural Gas (EPNG) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.050.100.150.20Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.097+0.000
Nov 260.097+0.001
Nov 250.096-0.005
Nov 240.101+0.000
Nov 230.101-0.030
Nov 220.130-0.020
Nov 210.150+0.073
Nov 200.078-0.015
Nov 190.093-0.010
Nov 180.102+0.010
Nov 170.093+0.000
Nov 160.093+0.000
Nov 150.093+0.000
Nov 140.093+0.000
Nov 130.093-0.006
Nov 120.098-0.001
Nov 110.100-0.016
Nov 100.116+0.016
Nov 90.100+0.000
Nov 80.100+0.020
Nov 70.080-0.020
Nov 60.100+0.000
Nov 50.100+0.000
Nov 40.100+0.000
Nov 30.100-0.029
Nov 20.129-0.004
Nov 10.133+0.092
Oct 310.040-0.016
Oct 300.057-0.006
Oct 290.063—
85 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
El Paso Natural Gas

El Paso Natural GasState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on El Paso Natural Gas (EPNG)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All El Paso Natural Gas (EPNG) notices →

El Paso Natural Gas (EPNG) · posted 2026-11-17 · effective 2026-11-17 · force majeure
EPNG has declared force majeure at Laguna Compressor Station in Cibola County, New Mexico following a compressor gasket leak. The station is unavailable while repairs are completed, reducing operational capacity through the CAPROCK N constraint by 77,194 Dth/d (0.077 Bcf/d) effec…
El Paso Natural Gas (EPNG) · posted 2026-11-17 · effective 2026-11-17 · informational
El Paso Natural Gas (EPNG) · posted 2026-11-04 · effective 2026-11-04 · informational
El Paso Natural Gas (EPNG) · posted 2026-11-03 · effective 2026-11-03 · force majeure
EPNG declared force majeure at Lincoln Compressor Station in Lincoln County, New Mexico due to a flame detection failure. This Update #1 escalates the capacity reduction through the CAPROCK N constraint from 214,491 Dth/d to 274,843 Dth/d (~0.275 Bcf/d), effective Intraday 1 Cycl…
El Paso Natural Gas (EPNG) · posted 2026-10-31 · effective 2026-10-31 · force majeure
EPNG has declared force majeure at its Roswell Compressor Station in Chaves County, New Mexico, following a turbo thrust bearing failure that has taken the station fully offline. Operational capacity through the CAPROCK N constraint will be reduced by 175,228 Dth/d (0.175 Bcf/d) …
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-29 · force majeure
EPNG Force Majeure Update #2 on Line No. 1600 (third-party line strike downstream of Waha Compressor Station, Reeves County TX) adds the WA CORN scheduling constraint to zero net capacity effective Intraday 1 Cycle (Cycle 3) on October 29, 2026, joining previously zeroed Imperial…
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-29 · force majeure
EPNG Update #1 on the Line 1600 third-party line strike downstream of Waha Compressor Station in Reeves County, TX: the repair now requires full pipeline replacement rather than a simple pressure restriction. Two additional point locations -- Imperial Receipt/Delivery (loc 58045)…
El Paso Natural Gas (EPNG) · posted 2026-10-29 · effective 2026-10-28 · force majeure
EPNG has declared force majeure on Line No. 1600 downstream of Waha Compressor Station in Reeves County, TX following a third-party line strike. The L1600EST constraint is initially capped at 0.250 Bcf/d effective Intraday 3 Cycle on October 28, dropping to zero effective the Eve…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, ET G&P/EPNG (IREDBLUF) RED BLUFF RE (El Paso Natural Gas (EPNG) loc 800911) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/epng/800911/