Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

NG - Phoenix Line 63 - Sithe*

Empire Pipeline · Loc 012002010
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.114
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.123
Bcf/d
30-day average
0.133
30 of 30 days posted
30-day high
0.175
Nov 14
30-day low
0.100
Nov 22
Operating capacity
0.300
Bcf/d as posted, evening cycle
Utilization
38%
headroom 62%

Scheduled quantities as posted by Empire Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.150.20Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.114+0.000
Nov 260.114-0.051
Nov 250.165-0.001
Nov 240.165+0.060
Nov 230.105+0.005
Nov 220.100+0.000
Nov 210.100+0.000
Nov 200.100+0.000
Nov 190.100-0.025
Nov 180.125-0.014
Nov 170.139-0.033
Nov 160.172+0.000
Nov 150.171-0.004
Nov 140.175+0.004
Nov 130.171+0.015
Nov 120.156+0.017
Nov 110.139+0.035
Nov 100.104-0.021
Nov 90.125-0.023
Nov 80.149+0.023
Nov 70.125-0.023
Nov 60.149+0.030
Nov 50.119-0.005
Nov 40.124-0.025
Nov 30.149+0.000
Nov 20.149+0.000
Nov 10.149+0.035
Oct 310.114+0.000
Oct 300.114+0.003
Oct 290.111—
88 more days on file for this meter, back to August 2, 2026. Full meter-level history is part of Institutional (API and downloads).
NG - Phoenix Line 63 - Sithe*

Placed at the center of Onondaga, NY — approximate; the exact meter site is not published.

No recent notices matched or named this point, and no severity 3+ notices on Empire Pipeline in the last 30 days.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NG - Phoenix Line 63 - Sithe* (Empire Pipeline loc 012002010) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/empire-pipeline/012002010/