Enercast — at the moment it matters
Home / Daily Summary / Storage / Meter

Tioga (UGI Storage interconnect)

EGTS · Loc 90002 · Northeast
Storage injection / withdrawal · counted in Storage
Gas day Nov 27
-0.019
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
-0.020
Bcf/d
30-day average
-0.018
30 of 30 days posted
30-day high
-0.000
Nov 25
30-day low
-0.044
Nov 6
Operating capacity
0.104
Bcf/d as posted, evening cycle
Utilization
18%
headroom 82%

Scheduled quantities as posted by EGTS on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Positive = net injection, negative = net withdrawal. Same figure as this meter’s row on the Storage page.

-0.060-0.040-0.0200.000Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 27-0.019+0.000
Nov 26-0.019-0.019
Nov 25-0.000+0.000
Nov 24-0.000+0.035
Nov 23-0.035+0.000
Nov 22-0.035+0.000
Nov 21-0.035-0.035
Nov 20-0.000+0.000
Nov 19-0.000+0.000
Nov 18-0.000+0.000
Nov 17-0.000+0.000
Nov 16-0.000+0.000
Nov 15-0.000+0.000
Nov 14-0.000+0.000
Nov 13-0.000+0.008
Nov 12-0.008+0.022
Nov 11-0.029-0.029
Nov 10-0.000+0.039
Nov 9-0.039+0.000
Nov 8-0.039+0.000
Nov 7-0.039+0.005
Nov 6-0.044+0.000
Nov 5-0.044+0.000
Nov 4-0.044-0.015
Nov 3-0.029+0.000
Nov 2-0.029+0.000
Nov 1-0.029-0.019
Oct 31-0.011+0.000
Oct 30-0.011-0.006
Oct 29-0.005—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Eastern Gas Transmission (EGTS)

Eastern Gas Transmission (EGTS)Exact site not geocoded — the highlighted line is the pipeline system this meter sits on.

Recent notices on EGTS

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All EGTS notices →

EGTS · posted 2026-11-18 · effective 2026-11-19 · informational
EGTS · posted 2026-11-16 · effective 2026-11-17 · informational
EGTS · posted 2026-11-13 · effective 2026-11-13 · informational
EGTS · posted 2026-11-09 · effective 2026-11-11 · informational
EGTS · posted 2026-11-08 · effective 2026-11-10 · informational
EGTS · posted 2026-11-06 · effective 2026-11-06 · informational
EGTS · posted 2026-11-06 · effective 2026-11-10 · informational
EGTS · posted 2026-11-05 · effective 2026-11-07 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Tioga (UGI Storage interconnect) (EGTS loc 90002) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/egts/90002/