Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

COLUMBIA GAS OF PA (PLEASANT GAP)

EGTS · Loc 21305 · ALLEGHENY, Pennsylvania
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.013
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.012
Bcf/d
30-day average
0.011
30 of 30 days posted
30-day high
0.013
Nov 27
30-day low
0.008
Oct 31
Operating capacity
0.051
Bcf/d as posted, evening cycle
Utilization
25%
headroom 75%

Scheduled quantities as posted by EGTS on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0050.0100.015Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.013+0.000
Nov 260.013+0.000
Nov 250.013+0.000
Nov 240.013+0.000
Nov 230.013+0.002
Nov 220.011+0.000
Nov 210.011-0.001
Nov 200.011+0.000
Nov 190.011-0.002
Nov 180.013+0.000
Nov 170.013+0.000
Nov 160.013+0.000
Nov 150.013+0.000
Nov 140.013+0.000
Nov 130.013+0.000
Nov 120.013+0.002
Nov 110.011-0.001
Nov 100.012-0.000
Nov 90.012+0.001
Nov 80.011+0.001
Nov 70.011+0.000
Nov 60.011+0.000
Nov 50.011+0.000
Nov 40.011+0.000
Nov 30.011-0.000
Nov 20.011+0.000
Nov 10.011+0.003
Oct 310.008+0.000
Oct 300.008+0.000
Oct 290.008—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Eastern Gas Transmission (EGTS)COLUMBIA GAS OF PA (PLEASANT GAP)

Eastern Gas Transmission (EGTS)Placed at the center of Allegheny, PA — approximate; the exact meter site is not published.

Recent notices on EGTS

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All EGTS notices →

EGTS · posted 2026-11-18 · effective 2026-11-19 · informational
EGTS · posted 2026-11-16 · effective 2026-11-17 · informational
EGTS · posted 2026-11-13 · effective 2026-11-13 · informational
EGTS · posted 2026-11-09 · effective 2026-11-11 · informational
EGTS · posted 2026-11-08 · effective 2026-11-10 · informational
EGTS · posted 2026-11-06 · effective 2026-11-06 · informational
EGTS · posted 2026-11-06 · effective 2026-11-10 · informational
EGTS · posted 2026-11-05 · effective 2026-11-07 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, COLUMBIA GAS OF PA (PLEASANT GAP) (EGTS loc 21305) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/egts/21305/